Skip to content
Gridcensus

Broomfield County, Colorado · WECC

DC Readiness
58.0
Good / 100

At a glance

PARKWAY is a substation-adjacent datacenter candidate site in Broomfield County, Colorado, scoring 58.0/100 DC Readiness — 27th of 58 scored sites in the county. Its nearest substation is PARKWAY (0 mi, 115 kV). It sits in the WECC grid region and the PUBLIC SERVICE CO OF COLORADO service territory, where interconnection has averaged 3.5 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationPARKWAY
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityPUBLIC SERVICE CO OF COLORADOinvestor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPLSVL-CTC1
IXP distance6.2 mi
Fiber providers6
Fiber coverage36.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterJPMorgan Chase
DC distance0.6 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.10¢/kWh
Industrial electricity8.32¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$8,319

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track PARKWAY

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does PARKWAY compare with other sites in Broomfield County?

PARKWAY ranks 27th of 58 scored candidate sites in Broomfield County. Its 58.0/100 is roughly in line with the county average of 58.4. It is about 15% above the Colorado average of 50.6 and roughly in line with the national average of 53.2.

Against the Colorado average, its strongest sub-score is power availability (56 vs 38) and its weakest is speed to power (50 vs 53). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is PARKWAY to power, fiber and other datacenters?

The nearest mapped substation, PARKWAY, is about 0 miles away and operates at 115 kV. For connectivity, the nearest internet exchange facility is LSVL-CTC1 at 6.2 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is JPMorgan Chase, 0.6 miles away.

What are the flood, water and hazard risks at PARKWAY?

At the county level, FEMA's National Risk Index rates Broomfield County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
50
Fiber connectivity12%
78
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
100
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Broomfield County, ranked by DC Readiness.

Sites near PARKWAY
SiteTypeVoltageCapacityQueue waitScore
VALMONTSubstation-Adjacent230 kV300 MW3.5 yrs63.6
UNKNOWN203852Substation-Adjacent230 kV300 MW3.5 yrs62.9
ISABELLESubstation-Adjacent230 kV300 MW4.3 yrs62.5
WASHINGTONSubstation-Adjacent230 kV300 MW3.5 yrs62.2
RIDGESubstation-Adjacent230 kV300 MW3.5 yrs62.1
ERIESubstation-Adjacent230 kV300 MW4.3 yrs62.1
UNKNOWN204085Substation-Adjacent230 kV300 MW4.3 yrs62.1
JAMES L GREENSubstation-Adjacent230 kV300 MW3.5 yrs62.1

PARKWAY: common questions

What is the DC Readiness score of PARKWAY?

PARKWAY scores 58.0/100 on the GridCensus DC Readiness scale, rated good. It ranks 27th of 58 scored sites in Broomfield County. The Broomfield County average is 58.4 and the Colorado average is 50.6.

What is the nearest substation to PARKWAY?

The nearest mapped substation is PARKWAY, about 0 miles away, at 115 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves PARKWAY?

PUBLIC SERVICE CO OF COLORADO (investor owned) holds the retail service territory that contains the site; its holding company is XCEL ENERGY.

What grid region is PARKWAY in?

PARKWAY is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is PARKWAY from an internet exchange?

The nearest internet exchange facility is LSVL-CTC1, about 6.2 miles away; 6 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “PARKWAY, Broomfield County, CO”, https://gridcensus.com/datacenter-sites/colorado/broomfield-county/parkway-8f1ae3ce (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for PARKWAY, Broomfield County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.