OZ Alamosa
GreenfieldAlamosa County, Colorado · WECC
OZ Alamosa is a greenfield datacenter candidate site in Alamosa County, Colorado, interconnecting through WECC. It screens at 51.0/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Alamosa County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| ALAMOSA | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 61.3 |
| SAN LUIS VALLEY SOLAR RANCH | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 58.6 |
| SAN LUIS VALLEY | Substation-Adjacent | 230 kV | 300 MW | 1.7 yrs | 58.6 |
| SARGENT | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 58.0 |
| TAP204025 | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 57.6 |
| COGENTRIX OF ALAMOSA | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 57.5 |
| BLM Solar DLA: Fourmile East | Greenfield | — | 765 MW | 1.7 yrs | 56.5 |
| Greenfield (SAN LUIS VALLEY - PONCHA) | Greenfield | 230 kV | 300 MW | 1.7 yrs | 55.6 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for OZ Alamosa, Alamosa County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.