Proposed Special Education and Alternative Educati
IndustrialStanislaus County, California · WECC
At a glance
Proposed Special Education and Alternative Educati is an industrial datacenter candidate site in Stanislaus County, California, scoring 44.9/100 DC Readiness — 46th of 107 scored sites in the county. It sits in the WECC grid region and the TURLOCK IRRIGATION DISTRICT service territory, where interconnection has averaged 7.6 years from request to operation.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Site location
Get alerts
Track Proposed Special Education and Alternative Educati
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Proposed Special Education and Alternative Educati compare with other sites in Stanislaus County?
Proposed Special Education and Alternative Educati ranks 46th of 107 scored candidate sites in Stanislaus County. Its 44.9/100 is roughly in line with the county average of 47.0. It is roughly in line with the California average of 45.4 and about 16% below the national average of 53.2.
Against the California average, its strongest sub-score is fiber connectivity (71 vs 66) and its weakest is power availability (30 vs 36). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Proposed Special Education and Alternative Educati to power, fiber and other datacenters?
The nearest located transmission bottleneck is 34009_CRWCRKSS_60.0_34016_CRWS LDS_60.0_BR_1 _1 (CAISO), 8 miles away. For connectivity, the nearest internet exchange facility is 801 Tenth Street Modesto (Ayera) at 13 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is 801 Tenth Street Modesto (Ayera), 13 miles away.
What are the flood, water and hazard risks at Proposed Special Education and Alternative Educati?
At the county level, FEMA's National Risk Index rates Stanislaus County "Relatively High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Stanislaus County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| PRESCOTT | Substation-Adjacent | 230 kV | 300 MW | 7.6 yrs | 57.1 |
| ROSEMORE B | Substation-Adjacent | 230 kV | 300 MW | 7.6 yrs | 57.0 |
| PARKER | Substation-Adjacent | 230 kV | 300 MW | 7.6 yrs | 56.1 |
| Turlock Irrigation District Fuel Cell | Brownfield | 66 kV | 1 MW | 7.6 yrs | 55.9 |
| WALNUT | Substation-Adjacent | 230 kV | 300 MW | 7.6 yrs | 55.5 |
| OZ Stanislaus | Greenfield | — | — | 7.6 yrs | 55.4 |
| COTTLE | Substation-Adjacent | 230 kV | 300 MW | 7.6 yrs | 55.4 |
| WARNERVILLE | Substation-Adjacent | 230 kV | 300 MW | 7.6 yrs | 55.3 |
Proposed Special Education and Alternative Educati: common questions
What is the DC Readiness score of Proposed Special Education and Alternative Educati?
Proposed Special Education and Alternative Educati scores 44.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 46th of 107 scored sites in Stanislaus County. The Stanislaus County average is 47.0 and the California average is 45.4.
Which electric utility serves Proposed Special Education and Alternative Educati?
TURLOCK IRRIGATION DISTRICT (political subdivision) holds the retail service territory that contains the site.
What grid region is Proposed Special Education and Alternative Educati in?
Proposed Special Education and Alternative Educati is in the WECC region. Projects interconnecting there have averaged a 7.6-year wait from queue request to operation.
How far is Proposed Special Education and Alternative Educati from an internet exchange?
The nearest internet exchange facility is 801 Tenth Street Modesto (Ayera), about 13 miles away; 7 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Proposed Special Education and Alternative Educati, Stanislaus County, CA”, https://gridcensus.com/datacenter-sites/california/stanislaus-county/proposed-special-education-and-alternative-educati-a25fdb5e (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Proposed Special Education and Alternative Educati, Stanislaus County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.