Solano Project

Federal Excess

Napa, California · CAISO

DC Readiness
41.6
Fair / 100

Solano Project is a federal excess datacenter candidate site in Napa, California, interconnecting through CAISO. It screens at 41.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionCAISO
Queue depth311

Connectivity

Nearest IXPX2nSat Petaluma
IXP distance33.9 mi

Site characteristics

Acreage24 ac
Former useReclamation and Irrigation

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterPG&E Datacenter
DC distance19.9 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity29.96¢/kWh
Industrial electricity22.93¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$61,295

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
31
Fiber connectivity12%
52
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
35
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Napa, ranked by DC Readiness.

Sites near Solano Project
SiteTypeVoltageCapacityQueue waitScore
SONOMASubstation-Adjacent115 kV100 MW5.7 yrs57.7
SILVERADOSubstation-Adjacent115 kV100 MW5.7 yrs54.3
Greenfield (FULTON - IGNACIO)Greenfield230 kV300 MW5.7 yrs54.2
PUEBLOSubstation-Adjacent115 kV100 MW5.7 yrs54.1
Greenfield (LAKEVILLE - GEYSERS TAP 1)Greenfield230 kV300 MW5.7 yrs53.6
Greenfield (LAKEVILLE - GEYSERS TAP 1)Greenfield230 kV300 MW5.7 yrs52.4
NAPASubstation-Adjacent115 kV100 MW5.7 yrs52.3
Greenfield (LAKEVILLE - GEYSERS TAP 1)Greenfield230 kV300 MW5.7 yrs52.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Solano Project, Napa. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.