Modoc County, California · WECC

DC Readiness
43.5
Fair / 100

At a glance

EAGLEVILLE is a substation-adjacent datacenter candidate site in Modoc County, California, scoring 43.5/100 DC Readiness — 29th of 44 scored sites in the county. Its nearest substation is EAGLEVILLE (0 mi, 69 kV). It sits in the WECC grid region and the SURPRISE VALLEY ELECTRIFICATION service territory, where interconnection has averaged 7.6 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationEAGLEVILLE
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilitySURPRISE VALLEY ELECTRIFICATIONcooperativemoderate to large load · state default

Speed to power

Interconnection outlookConstrained
≈ 8.3 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth227
Avg queue wait7.6 yrs
Recent queue wait8.3 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPCENTRA RNO01 - Reno Nevada (200 S. Virginia)
IXP distance126.1 mi
Fiber providers3
Fiber coverage25.8%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score52/100

Location context

Nearest datacenterDatacenter 01210199368
DC distance125.6 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity17.39¢/kWh
Industrial electricity14.50¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$4,267

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EAGLEVILLE

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EAGLEVILLE compare with other sites in Modoc County?

EAGLEVILLE ranks 29th of 44 scored candidate sites in Modoc County. Its 43.5/100 is roughly in line with the county average of 44.2. It is roughly in line with the California average of 45.4 and about 18% below the national average of 53.2.

Against the California average, its strongest sub-score is power availability (46 vs 36) and its weakest is fiber connectivity (46 vs 66). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EAGLEVILLE to power, fiber and other datacenters?

The nearest mapped substation, EAGLEVILLE, is about 0 miles away and operates at 69 kV. For connectivity, the nearest internet exchange facility is CENTRA RNO01 - Reno Nevada (200 S. Virginia) at 126.1 miles. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 01210199368, 125.6 miles away.

What are the flood, water and hazard risks at EAGLEVILLE?

At the county level, FEMA's National Risk Index rates Modoc County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
42
Fiber connectivity12%
46
Energy cost10%
50
Water risk7%
24
Natural hazard6%
52
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Modoc County, ranked by DC Readiness.

Sites near EAGLEVILLE
SiteTypeVoltageCapacityQueue waitScore
MALINSubstation-Adjacent500 kV1,000 MW3.5 yrs56.6
HILLTOPSubstation-Adjacent345 kV600 MW7.6 yrs52.7
WARNERSubstation-Adjacent230 kV300 MW7.6 yrs51.1
TAP310737Substation-Adjacent230 kV300 MW7.6 yrs51.1
TAP302651Substation-Adjacent230 kV300 MW7.6 yrs50.9
HILLTOP TAPSubstation-Adjacent230 kV300 MW7.6 yrs50.7
TURKEY HILLSubstation-Adjacent69 kV50 MW3.5 yrs46.3
TAP203364Substation-Adjacent115 kV100 MW7.6 yrs46.1

EAGLEVILLE: common questions

What is the DC Readiness score of EAGLEVILLE?

EAGLEVILLE scores 43.5/100 on the GridCensus DC Readiness scale, rated fair. It ranks 29th of 44 scored sites in Modoc County. The Modoc County average is 44.2 and the California average is 45.4.

What is the nearest substation to EAGLEVILLE?

The nearest mapped substation is EAGLEVILLE, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves EAGLEVILLE?

SURPRISE VALLEY ELECTRIFICATION (cooperative) holds the retail service territory that contains the site; its holding company is SURPRISE VALLEY ELECTRIFICATION CORP.

What grid region is EAGLEVILLE in?

EAGLEVILLE is in the WECC region. Projects interconnecting there have averaged a 7.6-year wait from queue request to operation.

How far is EAGLEVILLE from an internet exchange?

The nearest internet exchange facility is CENTRA RNO01 - Reno Nevada (200 S. Virginia), about 126.1 miles away; 3 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EAGLEVILLE, Modoc County, CA”, https://gridcensus.com/datacenter-sites/california/modoc-county/eagleville-ff979226 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EAGLEVILLE, Modoc County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.