Greenfield (MARTIN - UNKNOWN176473) is a greenfield datacenter candidate site in Martin County, California, interconnecting through SERC. It screens at 50.9/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 7.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMARTIN
Substation voltage230 kV
Available capacity300 MW

Speed to power

Interconnection outlookConstrained
≈ 8.3 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionSERC
Queue depth227
Avg queue wait7.6 yrs
Recent queue wait8.3 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPTelxius Boca Raton DC
IXP distance62.4 mi
Fiber providers5
Fiber coverage44.2%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterEquinix MI3 - Miami, Boca Raton
DC distance63.6 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.75¢/kWh
Industrial electricity8.03¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$7,304

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (MARTIN - UNKNOWN176473)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power20%
51
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Martin County, ranked by DC Readiness.

Sites near Greenfield (MARTIN - UNKNOWN176473)
SiteTypeVoltageCapacityQueue waitScore
MARTINSubstation-Adjacent500 kV1,000 MW3.7 yrs68.0
UNKNOWN124074Substation-Adjacent230 kV300 MW3.7 yrs62.9
CRANESubstation-Adjacent230 kV300 MW3.7 yrs60.9
ALEXANDERSubstation-Adjacent230 kV300 MW3.7 yrs60.9
UNKNOWN157879Substation-Adjacent230 kV300 MW3.7 yrs60.9
HANSONSubstation-Adjacent230 kV300 MW3.7 yrs60.9
TESOROSubstation-Adjacent230 kV300 MW3.7 yrs60.8
BRIDGESubstation-Adjacent230 kV300 MW3.7 yrs60.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (MARTIN - UNKNOWN176473), Martin County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.