DC Readiness
46.2
Fair / 100

At a glance

NILAND is a substation-adjacent datacenter candidate site in Imperial County, California, scoring 46.2/100 DC Readiness — 23rd of 225 scored sites in the county. Its nearest substation is NILAND (0 mi, 115 kV). It sits in the WECC grid region and the IMPERIAL IRRIGATION DISTRICT service territory, where interconnection has averaged 7.6 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationNILAND
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityIMPERIAL IRRIGATION DISTRICTpolitical subdivisionmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookConstrained
≈ 8.3 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth227
Avg queue wait7.6 yrs
Recent queue wait8.3 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPDataBank San Diego (SAN1)
IXP distance92.6 mi
Fiber providers4
Fiber coverage8.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score52/100

Location context

Nearest datacenterDataBank San Diego (SAN1)
DC distance92.6 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity19.28¢/kWh
Industrial electricity18.95¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$11,892

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track NILAND

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does NILAND compare with other sites in Imperial County?

NILAND ranks 23rd of 225 scored candidate sites in Imperial County. Its 46.2/100 is about 11% above the county average of 41.5. It is roughly in line with the California average of 45.4 and about 13% below the national average of 53.2.

Against the California average, its strongest sub-score is power availability (56 vs 36) and its weakest is fiber connectivity (52 vs 66). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is NILAND to power, fiber and other datacenters?

The nearest mapped substation, NILAND, is about 0 miles away and operates at 115 kV. The nearest located transmission bottleneck is 99254_J.HINDS2_230_24806_MIRAGE _230_BR_1 _1 (CAISO), 64 miles away. For connectivity, the nearest internet exchange facility is DataBank San Diego (SAN1) at 92.6 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is DataBank San Diego (SAN1), 92.6 miles away.

What are the flood, water and hazard risks at NILAND?

At the county level, FEMA's National Risk Index rates Imperial County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
42
Fiber connectivity12%
52
Energy cost10%
50
Water risk7%
24
Natural hazard6%
52
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Imperial County, ranked by DC Readiness.

Sites near NILAND
SiteTypeVoltageCapacityQueue waitScore
IMPERIAL VALLEYSubstation-Adjacent500 kV1,000 MW7.6 yrs55.0
IMPERIAL VALLEYSubstation-Adjacent500 kV1,000 MW7.6 yrs54.6
Heber GeothermalBrownfield66 kV59 MW7.6 yrs54.3
UNKNOWN301886Substation-Adjacent345 kV600 MW7.6 yrs53.2
Hudson Ranch Power II LLCBrownfield230 kV55 MW7.6 yrs52.0
EL CENTROSubstation-Adjacent230 kV300 MW7.6 yrs51.6
HIGHLINESubstation-Adjacent230 kV300 MW7.6 yrs50.6
MIDWAYSubstation-Adjacent230 kV300 MW7.6 yrs50.5

NILAND: common questions

What is the DC Readiness score of NILAND?

NILAND scores 46.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 23rd of 225 scored sites in Imperial County. The Imperial County average is 41.5 and the California average is 45.4.

What is the nearest substation to NILAND?

The nearest mapped substation is NILAND, about 0 miles away, at 115 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves NILAND?

IMPERIAL IRRIGATION DISTRICT (political subdivision) holds the retail service territory that contains the site.

What grid region is NILAND in?

NILAND is in the WECC region. Projects interconnecting there have averaged a 7.6-year wait from queue request to operation.

How far is NILAND from an internet exchange?

The nearest internet exchange facility is DataBank San Diego (SAN1), about 92.6 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “NILAND, Imperial County, CA”, https://gridcensus.com/datacenter-sites/california/imperial-county/niland-4248693c (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for NILAND, Imperial County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.