Colorado River Front Work & Levee System
Federal ExcessImperial County, California · CAISO
Colorado River Front Work & Levee System is a federal excess datacenter candidate site in Imperial County, California, interconnecting through CAISO. It screens at 39.5/100 DC Readiness.
Power & interconnection
Connectivity
Risk & environment
Location context
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Imperial County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| IMPERIAL VALLEY | Substation-Adjacent | 500 kV | 1,000 MW | 5.7 yrs | 58.4 |
| BANNISTER | Substation-Adjacent | 230 kV | 300 MW | 5.7 yrs | 56.9 |
| Greenfield (NORTH GILA - IMPERIAL VALLEY) | Greenfield | 500 kV | 1,000 MW | 5.7 yrs | 56.5 |
| MIDWAY | Substation-Adjacent | 230 kV | 300 MW | 5.7 yrs | 56.3 |
| EL CENTRO | Substation-Adjacent | 230 kV | 300 MW | 5.7 yrs | 56.1 |
| KNOB | Substation-Adjacent | 230 kV | 300 MW | 5.7 yrs | 56.1 |
| Greenfield (NORTH GILA - IMPERIAL VALLEY) | Greenfield | 500 kV | 1,000 MW | 5.7 yrs | 55.9 |
| YUCCA | Substation-Adjacent | 161 kV | 100 MW | 5.7 yrs | 55.6 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.