Skip to content
Gridcensus

BLM Solar DLA: Imperial East

Greenfield

Imperial County, California · CAISO

DC Readiness
45.6
Fair / 100

BLM Solar DLA: Imperial East is a greenfield datacenter candidate site in Imperial County, California, interconnecting through CAISO. It screens at 45.6/100 DC Readiness with a catalogued 1,350 MW of candidate capacity and a 5.7 yrs average interconnection-queue wait.

Power & interconnection

Available capacity1,350 MW
LMP zoneCAISO_SP15
Wholesale LMP$11.23/MWh
Utility commercial rate0.19¢/kWh
UtilityIMPERIAL IRRIGATION DISTRICTpolitical subdivisionmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 3.0 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionCAISO
Queue depth227
Avg queue wait5.7 yrs
Recent queue wait3.0 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPBorder Crossing Pop 1
IXP distance108.0 mi
Fiber providers4
Fiber coverage8.0%
Nearest cloud providerAzure
Nearest cloud regionwestus3
Cloud region distance186.8 mi

Site characteristics

Site typeGreenfield
Acreage8,101 ac
Buildable load (est.)~3,240–8,101 MWland-based· grid headroom is tighter
Land contactBLM California State Office
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub
Former useblm_solar_dla

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score52/100
Construction cost index83.5 (avg 100)

Location context

Nearest datacenterBorder Crossing Pop 1
DC distance108.0 mi
Nearest rail18.3 mi
Nearest gas pipeline14.6 mi
Nearest fiber route108.7 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity19.28¢/kWh
Industrial electricity18.95¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$11,892

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track BLM Solar DLA: Imperial East

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
48
Speed to power20%
29
Fiber connectivity12%
49
Energy cost10%
56
Water risk7%
24
Natural hazard6%
52
Buildability7%
70
Labor market4%
50
DC cluster4%
20
Land / acreage3%
49
Construction cost3%
80
Gas pipeline2%
53
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Imperial County, ranked by DC Readiness.

Sites near BLM Solar DLA: Imperial East
SiteTypeVoltageCapacityQueue waitScore
Heber GeothermalBrownfield66 kV59 MW5.7 yrs52.8
IMPERIAL VALLEYSubstation-Adjacent500 kV1,000 MW8.2 yrs52.3
IMPERIAL VALLEYSubstation-Adjacent500 kV1,000 MW8.2 yrs51.9
Hudson Ranch Power II LLCBrownfield230 kV55 MW5.7 yrs50.7
UNKNOWN301886Substation-Adjacent345 kV600 MW8.2 yrs50.5
EL CENTROSubstation-Adjacent230 kV300 MW8.2 yrs49.7
Ormesa IBrownfield66 kV31 MW5.7 yrs48.8
HIGHLINESubstation-Adjacent230 kV300 MW8.2 yrs47.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for BLM Solar DLA: Imperial East, Imperial County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.