DC Readiness
49.3
Fair / 100

At a glance

Greenfield (NORTH MAGAZINE - WEST BOONEVIL) is a greenfield datacenter candidate site in Logan County, Arkansas, scoring 49.3/100 DC Readiness — 26th of 29 scored sites in the county. Its nearest substation is NORTH MAGAZINE. It sits in the SPP grid region and the ARKANSAS VALLEY ELEC COOP CORP service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationNORTH MAGAZINE
Substation voltage161 kV
Available capacity100 MW
UtilityARKANSAS VALLEY ELEC COOP CORPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth12
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance66.5 mi
Fiber providers4
Fiber coverage92.9%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterOzarksGo Fayetteville
DC distance66.5 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.80¢/kWh
Industrial electricity6.43¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$3,129

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (NORTH MAGAZINE - WEST BOONEVIL)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (NORTH MAGAZINE - WEST BOONEVIL) compare with other sites in Logan County?

Greenfield (NORTH MAGAZINE - WEST BOONEVIL) ranks 26th of 29 scored candidate sites in Logan County. Its 49.3/100 is roughly in line with the county average of 52.8. It is roughly in line with the Arkansas average of 53.6 and roughly in line with the national average of 53.2.

Against the Arkansas average, its strongest sub-score is speed to power (56 vs 51) and its weakest is power availability (32 vs 42). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (NORTH MAGAZINE - WEST BOONEVIL) to power, fiber and other datacenters?

The nearest mapped substation, NORTH MAGAZINE, is the closest grid connection point on record and operates at 161 kV. For connectivity, the nearest internet exchange facility is OzarksGo Fayetteville at 66.5 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is OzarksGo Fayetteville, 66.5 miles away.

What are the flood, water and hazard risks at Greenfield (NORTH MAGAZINE - WEST BOONEVIL)?

At the county level, FEMA's National Risk Index rates Logan County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power20%
56
Fiber connectivity12%
62
Energy cost10%
50
Water risk7%
84
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Logan County, ranked by DC Readiness.

Sites near Greenfield (NORTH MAGAZINE - WEST BOONEVIL)
SiteTypeVoltageCapacityQueue waitScore
OZ LoganGreenfield——4.3 yrs57.8
UNKNOWN117224Substation-Adjacent161 kV100 MW4.3 yrs57.3
SHORT MOUNTAINSubstation-Adjacent161 kV100 MW4.3 yrs57.2
BRANCHSubstation-Adjacent161 kV100 MW4.3 yrs57.0
RAZORBACKSubstation-Adjacent161 kV100 MW4.3 yrs56.6
EC Coal Logan CountyGreenfield——4.3 yrs56.6
TAP154324Substation-Adjacent161 kV100 MW4.3 yrs56.4
EC FFE Logan CountyGreenfield——4.3 yrs56.2

Greenfield (NORTH MAGAZINE - WEST BOONEVIL): common questions

What is the DC Readiness score of Greenfield (NORTH MAGAZINE - WEST BOONEVIL)?

Greenfield (NORTH MAGAZINE - WEST BOONEVIL) scores 49.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 26th of 29 scored sites in Logan County. The Logan County average is 52.8 and the Arkansas average is 53.6.

What is the nearest substation to Greenfield (NORTH MAGAZINE - WEST BOONEVIL)?

The nearest mapped substation is NORTH MAGAZINE, at 161 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves Greenfield (NORTH MAGAZINE - WEST BOONEVIL)?

ARKANSAS VALLEY ELEC COOP CORP (cooperative) holds the retail service territory that contains the site.

What grid region is Greenfield (NORTH MAGAZINE - WEST BOONEVIL) in?

Greenfield (NORTH MAGAZINE - WEST BOONEVIL) is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Greenfield (NORTH MAGAZINE - WEST BOONEVIL) from an internet exchange?

The nearest internet exchange facility is OzarksGo Fayetteville, about 66.5 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (NORTH MAGAZINE - WEST BOONEVIL), Logan County, AR”, https://gridcensus.com/datacenter-sites/arkansas/logan-county/greenfield-north-magazine-west-boonevil-25ba6497 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (NORTH MAGAZINE - WEST BOONEVIL), Logan County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.