Ajo Solar Project

Brownfield

Pima County, Arizona · WECC

DC Readiness
54.1
Fair / 100

Ajo Solar Project is a brownfield datacenter candidate site in Pima County, Arizona, interconnecting through WECC. It screens at 54.1/100 DC Readiness with a catalogued 5 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP310937
Substation distance2.0 mi
Substation voltage14 kV
Available capacity5 MW
Utility commercial rate0.14¢/kWh
UtilityARIZONA PUBLIC SERVICE COinvestor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPStream Data Centers - Phoenix I
IXP distance76.6 mi
Fiber providers10
Fiber coverage21.8%
Nearest cloud providerAzure
Nearest cloud regionwestus3
Cloud region distance86.3 mi

Site characteristics

Site typeBrownfield
Acreage38 ac
Buildable load (est.)~15–38 MWland-based· grid headroom is tighter
Land owner typeprivate
Buildability75.0/100
Former usemine
Existing capacity5 MW
Cleanup statuscleanup_complete

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)4.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index79.4 (avg 100)

Location context

Nearest datacenterPHX-10
DC distance75.8 mi
Nearest rail2.2 mi
Nearest gas pipeline4.9 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_reduction)
Commercial electricity14.34¢/kWh
Industrial electricity9.84¢/kWh
Cooling degree days3,400
Heating degree days1,500
Land price / acre$504

Regulatory climate

Restrictivestate posture · as of 2026-08

Sales-tax exemption suspended Jul 2026–Jun 2029; water constraints add scrutiny.

DC tax incentiveNo / suspended

Incentive detail: Government Property Lease Excise Tax (GPLET) for qualified facilities on government land.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Ajo Solar Project

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power20%
52
Fiber connectivity12%
55
Energy cost10%
94
Water risk7%
27
Natural hazard6%
78
Buildability7%
75
Labor market4%
50
DC cluster4%
30
Land / acreage3%
66
Construction cost3%
84
Gas pipeline2%
84
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Pima County, ranked by DC Readiness.

Sites near Ajo Solar Project
SiteTypeVoltageCapacityQueue waitScore
TUCSONSubstation-Adjacent345 kV600 MW6.9 yrs63.9
Tucson International Airport AreaBrownfield230 kV3 MW6.9 yrs63.6
OZ PimaGreenfield——5.7 yrs62.6
OZ PimaGreenfield——5.7 yrs62.2
OZ PimaGreenfield——5.7 yrs61.4
EC Near H Wilson Sundt Generating StationGreenfield——5.7 yrs61.2
OZ PimaGreenfield——5.7 yrs60.4
EC Near H Wilson Sundt Generating StationGreenfield——5.7 yrs59.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Ajo Solar Project, Pima County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.