DC Readiness
51.2
Fair / 100

EC FFE Greenlee County is a greenfield datacenter candidate site in Greenlee, Arizona, interconnecting through WECC. It screens at 51.2/100 DC Readiness and a 5.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.11¢/kWh
UtilityMORENCI WATER AND ELECTRICinvestor owned

Speed to power

Interconnection outlookConstrained
≈ 5.7 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait5.7 yrs
Recent queue wait5.7 yrs
Completion rate10%
Withdrawal rate90%

Connectivity

Nearest IXPLogin Tucson
IXP distance120.8 mi
Fiber providers2
Fiber coverage48.6%
Nearest cloud providerAzure
Nearest cloud regionwestus3
Cloud region distance164.4 mi

Site characteristics

Site typeGreenfield
Land contactGreenlee County County Assessor
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub
Former usefossil fuel employment

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone D
Water stress (WRI)4.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index122.3 (avg 100)

Location context

Nearest datacenterDirecTV DC
DC distance105.9 mi
Nearest rail11.6 mi
Nearest gas pipeline12.0 mi
Nearest fiber route116.2 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_reduction)
Commercial electricity11.00¢/kWh
Industrial electricity8.60¢/kWh
Cooling degree days3,400
Heating degree days1,500
Land price / acre$5,515

Regulatory climate

Restrictivestate posture · as of 2026-08

Sales-tax exemption suspended Jul 2026–Jun 2029; water constraints add scrutiny.

DC tax incentiveNo / suspended

Incentive detail: Government Property Lease Excise Tax (GPLET) for qualified facilities on government land.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC FFE Greenlee County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
54
Energy cost10%
90
Water risk7%
28
Natural hazard6%
78
Buildability7%
70
Labor market4%
50
DC cluster4%
25
Land / acreage3%
52
Construction cost3%
48
Gas pipeline2%
61
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Greenlee, ranked by DC Readiness.

Sites near EC FFE Greenlee County
SiteTypeVoltageCapacityQueue waitScore
GREENLEESubstation-Adjacent345 kV600 MW6.9 yrs58.2
MORENCISubstation-Adjacent230 kV300 MW6.9 yrs56.6
UNKNOWN309814Substation-Adjacent115 kV100 MW6.9 yrs52.2
OZ GreenleeGreenfield5.7 yrs51.8
OZ GreenleeGreenfield5.7 yrs46.3
Mine SiteFormer Mine6.9 yrs46.2
Mine SiteFormer Mine6.9 yrs46.1
Mine SiteFormer Mine6.9 yrs46.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC FFE Greenlee County, Greenlee. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.