Tuba City Disposal Green Remediation

Brownfield

Coconino County, Arizona · WECC

DC Readiness
51.2
Fair / 100

Tuba City Disposal Green Remediation is a brownfield datacenter candidate site in Coconino County, Arizona, interconnecting through WECC. It screens at 51.2/100 DC Readiness with a catalogued 0 MW of candidate capacity.

Power & interconnection

Substation distance23.1 mi
Substation voltage500 kV
Available capacity0 MW
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth68

Connectivity

Nearest IXPTonaquint Data Center - Saint George
IXP distance146.9 mi
Fiber providers5
Nearest cloud providerAzure
Nearest cloud regionwestus3
Cloud region distance190.7 mi

Site characteristics

Site typeBrownfield
Land owner typeprivate
Buildability75.0/100
Former usebrownfield
Existing capacity0 MW
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)4.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteTUBA CITY HOUSEHOLD HAZ WASTE COLLECTION
Hazard sub-score68/100
Construction cost index73.5 (avg 100)

Location context

Nearest datacenterLumen
DC distance143.3 mi
Nearest rail6.2 mi
Nearest gas pipeline5.0 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_reduction)
Commercial electricity14.11¢/kWh
Industrial electricity9.43¢/kWh
Cooling degree days3,400
Heating degree days1,500
Land price / acre$344

Incentive detail: Government Property Lease Excise Tax (GPLET) for qualified facilities on government land.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
35
Speed to power15%
26
Fiber connectivity12%
46
Energy cost10%
96
Water risk8%
41
Natural hazard8%
68
Buildability7%
75
Labor market4%
50
DC cluster4%
20
Land / acreage3%
72
Construction cost3%
89
Gas pipeline2%
84
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Coconino County, ranked by DC Readiness.

Sites near Tuba City Disposal Green Remediation
SiteTypeVoltageCapacityQueue waitScore
CEDAR MOUNTAINSubstation-Adjacent500 kV1,000 MW5.7 yrs65.4
FLAGSTAFFSubstation-Adjacent345 kV600 MW5.7 yrs62.0
MOENKOPISubstation-Adjacent500 kV1,000 MW5.7 yrs61.3
Greenfield (NAVAJO - DUGAS)Greenfield500 kV1,000 MW5.7 yrs59.8
Greenfield (CEDAR MOUNTAIN - MOENKOPI)Greenfield500 kV1,000 MW5.7 yrs59.5
COCONINOSubstation-Adjacent230 kV300 MW5.7 yrs59.3
Greenfield (YAVAPAI - CEDAR MOUNTAIN)Greenfield500 kV1,000 MW5.7 yrs59.0
Greenfield (NAVAJO - DUGAS)Greenfield500 kV1,000 MW5.7 yrs58.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Tuba City Disposal Green Remediation, Coconino County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.