Greenfield (UNKNOWN301048 - UNKNOWN305651)

Greenfield

Borden County, Arizona · SPP

DC Readiness
45.3
Fair / 100

At a glance

Greenfield (UNKNOWN301048 - UNKNOWN305651) is a greenfield datacenter candidate site in Borden County, Arizona, scoring 45.3/100 DC Readiness — 10th of 10 scored sites in the county. Its nearest substation is UNKNOWN301048. It sits in the SPP grid region, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN301048
Substation voltage138 kV
Available capacity100 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth34
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Fiber providers3
Fiber coverage56.9%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterAligned Lubbock
DC distance64.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.19¢/kWh
Industrial electricity10.35¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,141

Regulatory climate

Restrictivestate posture · as of 2026-08

Sales-tax exemption suspended Jul 2026–Jun 2029; water constraints add scrutiny.

DC tax incentiveNo / suspended

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (UNKNOWN301048 - UNKNOWN305651)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (UNKNOWN301048 - UNKNOWN305651) compare with other sites in Borden County?

Greenfield (UNKNOWN301048 - UNKNOWN305651) ranks 10th of 10 scored candidate sites in Borden County. Its 45.3/100 is about 17% below the county average of 54.5. It is roughly in line with the Arizona average of 48.5 and about 15% below the national average of 53.2.

Against the Arizona average, its strongest sub-score is water (44 vs 17) and its weakest is natural hazard (45 vs 77). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (UNKNOWN301048 - UNKNOWN305651) to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN301048, is the closest grid connection point on record and operates at 138 kV. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Aligned Lubbock, 64 miles away.

What are the flood, water and hazard risks at Greenfield (UNKNOWN301048 - UNKNOWN305651)?

At the county level, FEMA's National Risk Index rates Borden County "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
58
Fiber connectivity12%
54
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Borden County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN301048 - UNKNOWN305651)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN303793Substation-Adjacent345 kV600 MW3.5 yrs60.9
UNKNOWN305803Substation-Adjacent345 kV600 MW3.5 yrs60.2
BORDEN COSubstation-Adjacent230 kV300 MW3.5 yrs57.2
UNKNOWN302823Substation-Adjacent345 kV600 MW3.5 yrs57.1
UNKNOWN309242Substation-Adjacent138 kV100 MW3.5 yrs55.4
UNKNOWN301717Substation-Adjacent138 kV100 MW3.5 yrs54.6
Greenfield (UNKNOWN302132 - None)Greenfield345 kV600 MW3.5 yrs53.0
Greenfield (UNKNOWN302132 - None)Greenfield345 kV600 MW3.5 yrs52.8

Greenfield (UNKNOWN301048 - UNKNOWN305651): common questions

What is the DC Readiness score of Greenfield (UNKNOWN301048 - UNKNOWN305651)?

Greenfield (UNKNOWN301048 - UNKNOWN305651) scores 45.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 10th of 10 scored sites in Borden County. The Borden County average is 54.5 and the Arizona average is 48.5.

What is the nearest substation to Greenfield (UNKNOWN301048 - UNKNOWN305651)?

The nearest mapped substation is UNKNOWN301048, at 138 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

What grid region is Greenfield (UNKNOWN301048 - UNKNOWN305651) in?

Greenfield (UNKNOWN301048 - UNKNOWN305651) is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (UNKNOWN301048 - UNKNOWN305651), Borden County, AZ”, https://gridcensus.com/datacenter-sites/arizona/borden-county/greenfield-unknown301048-unknown305651-0a8c0f65 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (UNKNOWN301048 - UNKNOWN305651), Borden County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.