Skip to content
Gridcensus

Nstar Electric

Organization

139 catalogued assets · 6 states

Total assets
139

Nstar Electric is an organization in the GridCensus infrastructure catalog, owning or operating 139 catalogued assets across 6 states. An organization’s existing footprint — its power assets, fiber, land, and facilities — is a strong signal of where it can expand and which markets it already controls. Every asset below links to its full profile.

31
Candidate Sites Owned
108
Transmission Lines

Candidate Sites Owned (31)

SiteLocationDC ReadinessCandidate MW
EC Near Commercial StreetEssex, MA54.4/100—
EC Near Kendall Square StationMiddlesex, MA54.0/100—
EC Near General Electric Aircraft EnginesEssex, MA53.5/100—
EC Near Mystic Generating StationMiddlesex, MA53.4/100—
EC Near Salem HarborEssex, MA52.9/100—
EC Near New Boston Generating StationSuffolk, MA52.7/100—
EC Near Commercial StreetEssex, MA52.4/100—
EC Near Commercial StreetEssex, MA52.2/100—
EC Near Salem HarborEssex, MA52.2/100—
EC Near General Electric Aircraft EnginesEssex, MA52.0/100—
EC Coal Bristol CountyBristol County, MA51.6/100—
EC Near Salem HarborEssex, MA51.2/100—
EC Near Commercial StreetEssex, MA51.0/100—
EC Near Mystic Generating StationMiddlesex, MA50.9/100—
EC Near CanalBarnstable, MA50.0/100—
EC Near Salem HarborEssex, MA49.9/100—
EC Near Commercial StreetEssex, MA49.9/100—
EC Near Nantucket HybridNantucket, MA49.1/100—
EC Near CanalBarnstable, MA47.5/100—
EC Near CanalBarnstable, MA46.8/100—
EC Near Nantucket HybridNantucket, MA46.5/100—
EC FFE Barnstable CountyBarnstable County, MA46.5/100—
EC Near CanalBarnstable, MA46.3/100—
EC Near CanalBarnstable, MA46.2/100—
EC Near Nantucket HybridNantucket, MA43.8/100—
EC Near Nantucket HybridNantucket, MA43.6/100—
EC Near Nantucket HybridNantucket, MA43.3/100—
EC Near Nantucket HybridNantucket, MA43.2/100—
EC Near Nantucket HybridNantucket, MA43.2/100—
EC Near Nantucket HybridNantucket, MA42.9/100—
EC Near Nantucket HybridNantucket, MA42.6/100—

Transmission Lines (108)

LineStateVoltageLength
Line #157643Connecticut345 kV2.8 mi
Line #131551Massachusetts345 kV13.1 mi
Line #111894Arizona345 kV0.1 mi
Line #157639Florida345 kV9.2 mi
Line #157640Massachusetts345 kV14.1 mi
Line #157647Massachusetts345 kV14.1 mi
Line #157646Connecticut345 kV2.8 mi
Line #110876Massachusetts345 kV13.2 mi
Line #148335Massachusetts345 kV14.4 mi
Line #142277Massachusetts115 kV0.7 mi
Line #157657California115 kV5.7 mi
Line #141486Massachusetts115 kV4.0 mi
Line #150937Massachusetts115 kV4.2 mi
Line #150949Massachusetts115 kV2.9 mi
Line #135944Massachusetts115 kV5.4 mi
Line #147245Massachusetts115 kV0.0 mi
Line #118632Massachusetts115 kV0.0 mi
Line #165917Massachusetts115 kV2.5 mi
Line #157658Massachusetts115 kV7.5 mi
Line #147901Massachusetts115 kV5.1 mi
Line #137174Massachusetts115 kV0.7 mi
Line #172652Massachusetts115 kV7.9 mi
Line #172653Massachusetts115 kV4.3 mi
Line #157656Massachusetts115 kV3.6 mi
Line #157659California115 kV1.2 mi
Line #148810Massachusetts115 kV5.0 mi
Line #158162Massachusetts115 kV0.0 mi
Line #104930Indiana115 kV2.4 mi
Line #157140California115 kV6.9 mi
Line #119606Massachusetts115 kV3.8 mi
Line #147897Massachusetts115 kV5.1 mi
Line #126152Massachusetts115 kV8.8 mi
Line #122988Massachusetts115 kV12.2 mi
Line #157136California115 kV6.9 mi
Line #127585Massachusetts115 kV0.0 mi
Line #128442Massachusetts115 kV3.5 mi
Line #129847Massachusetts115 kV1.6 mi
Line #116546Massachusetts115 kV2.6 mi
Line #132919Massachusetts115 kV0.0 mi
Line #124140Massachusetts115 kV5.0 mi

Browse the full transmission-line map →

Is this your organization?

Claim the Nstar Electric profile to correct asset details, add capacity and availability, and surface your footprint to site-selection teams using GridCensus.

Dataset updated . Screening estimates derived from public data sources.

Organization records are derived from public infrastructure datasets (EIA, HIFLD, FCC, PNNL, county parcels, PeeringDB) and may be incomplete or lag operational changes. Owner/operator names are normalized for grouping; counts and capacities are catalogued estimates. Confirm ownership and availability directly with the organization.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Nstar Electric. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.