Superior Generation Energy Center

Brownfield

Superior, Douglas, Wisconsin · ALLETE, Inc.

Legacy capacity
170
MW

Superior Generation Energy Center is a natural gas plant in Superior, Douglas, Wisconsin. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 170 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity170 MW
EIA plant ID#8057

Grid hookup & remediation

Nearest substation0.2 mi
OperatorALLETE, Inc.
Operator address1616 31st Avenue East, Superior, WI, 54880
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Superior Generation Energy Center, ranked by DC Readiness.

Candidate sites near Superior Generation Energy Center
SiteTypeStateCountyVoltageCapacityQueue waitScore
HILLTOP 230/115KVSubstation-AdjacentMNCarlton County230 kV300 MW1.4 yrs73.0
UNKNOWN129277Substation-AdjacentMNCarlton County115 kV100 MW1.4 yrs71.7
M L HibbardBrownfieldWIDouglas50 MW71.4
UNKNOWN130957Substation-AdjacentWIDouglas County115 kV100 MW1.4 yrs71.2
Greenfield (STONE LAKE - ARROWHEAD)GreenfieldMNCarlton County345 kV600 MW1.4 yrs70.0
LAKE SUPERIOR PAPERSubstation-AdjacentWIDouglas County115 kV100 MW1.4 yrs69.9
POTLATCH 115KVSubstation-AdjacentMNCarlton County115 kV100 MW1.4 yrs69.9
TAP136169Substation-AdjacentWIDouglas County115 kV100 MW1.4 yrs69.6

Nearby internet exchanges

See all datacenter sites in Wisconsin

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Superior Generation Energy Center, Superior, Douglas, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.