Sappi Cloquet Mill

Brownfield

Cloquet, Carlton, Minnesota · Sappi Cloquet LLC

Legacy capacity
2
MW

Sappi Cloquet Mill is a former biomass site in Cloquet, Carlton, Minnesota, retired 1988-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer biomass site
Site typeretired_plant
Existing capacity2 MW
Retirement date1988-01-01
EIA plant ID#50639

Grid hookup & remediation

Nearest substation0.2 mi
Operator address2201 Avenue B, Cloquet, MN, 55720
Why this site is datacenter-attractive: a former biomass site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Carlton County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)8,560
Construction employment879
Land value$3,040/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate14.74¢/kWh
Industrial power rate8.34¢/kWh
Load growth (FERC-714)0.7%

Water & cooling

Water stressLow
Public water supply1.5 MGD
Industrial water use6.8 MGD
Cooling degree days600
Mean annual temp42°F

Hazard, flood & connectivity

FEMA risk index25.0 · Relatively Moderate
Fiber providers7 · 36% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Sappi Cloquet Mill — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Superior Generation Energy Centernatural gas plant17017.7 mi—
M L Hibbardoil plant5013.2 mi—
Moose Lakenatural gas plant324.4 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Sappi Cloquet Mill

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Sappi Cloquet Mill, ranked by DC Readiness.

Candidate sites near Sappi Cloquet Mill
SiteTypeStateCountyVoltageCapacityQueue waitScore
ARROWHEADSubstation-AdjacentMNCarlton County345 kV600 MW2.8 yrs66.2
OZ St. LouisGreenfieldMNSt. Louis——1.4 yrs65.8
OZ St. LouisGreenfieldMNSt. Louis——1.4 yrs64.6
HILLTOP 230/115KVSubstation-AdjacentMNCarlton County230 kV300 MW2.8 yrs64.6
TAP135605Substation-AdjacentMNCarlton County230 kV300 MW2.8 yrs64.4
EC Near M L HibbardGreenfieldMNCarlton——1.4 yrs63.3
STINSONSubstation-AdjacentWIDouglas County161 kV100 MW2.8 yrs62.2
EC Near M L HibbardGreenfieldMNCarlton——1.4 yrs61.6

Nearby internet exchanges

See all datacenter sites in Minnesota →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Sappi Cloquet Mill, Cloquet, Carlton, Minnesota. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.