Sappi Cloquet Mill

Brownfield

Cloquet, Carlton, Minnesota · Sappi Cloquet LLC

Legacy capacity
2
MW

Sappi Cloquet Mill is a former biomass site in Cloquet, Carlton, Minnesota, retired 1988-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer biomass site
Site typeretired_plant
Existing capacity2 MW
Retirement date1988-01-01
EIA plant ID#50639

Grid hookup & remediation

Nearest substation2.2 mi
OperatorSappi Cloquet LLC
Operator address2201 Avenue B, Cloquet, MN, 55720
Why this site is datacenter-attractive: a former biomass site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Sappi Cloquet Mill, ranked by DC Readiness.

Candidate sites near Sappi Cloquet Mill
SiteTypeStateCountyVoltageCapacityQueue waitScore
HILLTOP 230/115KVSubstation-AdjacentMNCarlton County230 kV300 MW1.4 yrs73.0
UNKNOWN129277Substation-AdjacentMNCarlton County115 kV100 MW1.4 yrs71.7
M L HibbardBrownfieldWIDouglas50 MW71.4
UNKNOWN130957Substation-AdjacentWIDouglas County115 kV100 MW1.4 yrs71.2
TAP135605Substation-AdjacentMNCarlton County230 kV300 MW1.4 yrs70.0
Greenfield (STONE LAKE - ARROWHEAD)GreenfieldMNCarlton County345 kV600 MW1.4 yrs70.0
LAKE SUPERIOR PAPERSubstation-AdjacentWIDouglas County115 kV100 MW1.4 yrs69.9
POTLATCH 115KVSubstation-AdjacentMNCarlton County115 kV100 MW1.4 yrs69.9

Nearby internet exchanges

See all datacenter sites in Minnesota

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.