MATC PV Evaluation Lab

Brownfield

Milwaukee, Wisconsin

Legacy capacity
1
MW

MATC PV Evaluation Lab is a former landfill site in Milwaukee, Wisconsin. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer landfill site
Site typeepa_brownfield
Existing capacity1 MW
Acreage32 ac

Grid hookup & remediation

Nearest substation0.8 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former landfill site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near MATC PV Evaluation Lab — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
South Oak Creekcoal plant61816.6 mi—
Port Washington Generating Stationcoal plant34022.7 mi—
MMSD Jones Island Wastewaternatural gas plant184.4 mi—
Milwaukee Countycoal plant113.3 mi—
College Avenue Landfillformer landfill site20.0 micleanup_complete
Omega Hills Gas Recoverynatural gas plant113.1 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track MATC PV Evaluation Lab

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near MATC PV Evaluation Lab, ranked by DC Readiness.

Candidate sites near MATC PV Evaluation Lab
SiteTypeStateCountyVoltageCapacityQueue waitScore
OAK CREEK STATIONSubstation-AdjacentWIMilwaukee County345 kV600 MW2.8 yrs71.9
GRANVILLESubstation-AdjacentWIMilwaukee County345 kV600 MW2.8 yrs67.6
RACINESubstation-AdjacentWIRacine County345 kV600 MW2.8 yrs67.3
ARCADIANSubstation-AdjacentWIWaukesha County345 kV600 MW2.8 yrs66.0
DEADEND167359Substation-AdjacentWIMilwaukee County230 kV300 MW2.8 yrs65.8
BLUEMOUNDSubstation-AdjacentWIMilwaukee County230 kV300 MW2.8 yrs65.8
CEDARSAUKSubstation-AdjacentWIOzaukee County345 kV600 MW2.8 yrs65.8
EC Near MMSD Jones Island WastewaterGreenfieldWIMilwaukee——1.4 yrs65.7

Nearby internet exchanges

See all datacenter sites in Wisconsin →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MATC PV Evaluation Lab, Milwaukee, Wisconsin. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.