Skip to content
Gridcensus

Genoa

Brownfield

Genoa, Vernon, Wisconsin · Dairyland Power Coop

Legacy capacity
346
MW

Genoa is a coal plant in Genoa, Vernon, Wisconsin, retired 2021-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 346 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity346 MW
Retirement date2021-06-01
EIA plant ID#4143

Grid hookup & remediation

Nearest substation0.2 mi
Operator addressS 4651 State Road 35, Genoa, WI, 54632
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Genoa, ranked by DC Readiness.

Candidate sites near Genoa
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Coal Houston CountyGreenfieldMNHouston County1.4 yrs62.4
EC Coal Houston CountyGreenfieldMNHouston County1.4 yrs62.1
EC Coal Vernon CountyGreenfieldWIVernon County1.4 yrs61.9
EC Coal La Crosse CountyGreenfieldWILa Crosse County1.4 yrs61.8
EC Coal Vernon CountyGreenfieldWIVernon County1.4 yrs61.7
EC Near GenoaGreenfieldWIVernon1.4 yrs61.4
EC Coal Vernon CountyGreenfieldWIVernon County1.4 yrs61.4
BRIGGS ROADSubstation-AdjacentWILa Crosse County345 kV600 MW2.8 yrs61.3

See all datacenter sites in Wisconsin

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Genoa, Genoa, Vernon, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.