Covington Facility

Brownfield

Covington, Alleghany, Virginia · WestRock Corp

Legacy capacity
27
MW

Covington Facility is a coal plant in Covington, Alleghany, Virginia, retired 2013-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 27 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity27 MW
Retirement date2013-12-01
EIA plant ID#50900

Grid hookup & remediation

Nearest substation0.4 mi
OperatorWestRock Corp
Operator address104 East Riverside St, Covington, VA, 24426
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Covington Facility, ranked by DC Readiness.

Candidate sites near Covington Facility
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLOVERDALE EASTSubstation-AdjacentVABotetourt County500 kV1,000 MW3.0 yrs75.6
LOWMOORSubstation-AdjacentVACovington city230 kV300 MW3.0 yrs69.0
Greenfield (LEXINGTON - CLOVERDALE EAST)GreenfieldVABotetourt County500 kV1,000 MW3.0 yrs68.7
COVINGTONSubstation-AdjacentVACovington city138 kV100 MW3.0 yrs68.2
CLIFTON FORGESubstation-AdjacentVACovington city230 kV300 MW3.0 yrs67.3
Greenfield (LEXINGTON - CLOVERDALE EAST)GreenfieldVABotetourt County500 kV1,000 MW3.0 yrs67.1
Greenfield (BATH COUNTY - LEXINGTON)GreenfieldVABath County500 kV1,000 MW3.0 yrs66.9
FUDGE HOLLOWSubstation-AdjacentVACovington city138 kV100 MW3.0 yrs66.1

See all datacenter sites in Virginia

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Covington Facility, Covington, Alleghany, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.