Bremo Bluff
BrownfieldBremo Bluff, Fluvanna, Virginia · Virginia Electric & Power Co
Bremo Bluff is a natural gas plant in Bremo Bluff, Fluvanna, Virginia, retired 2019-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 254 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Bremo Bluff, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CUNNINGHAM | Substation-Adjacent | VA | Fluvanna County | 500 kV | 1,000 MW | 3.8 yrs | 62.8 |
| EC Near Bremo Bluff | Greenfield | VA | Fluvanna | — | — | 3.1 yrs | 60.7 |
| UNKNOWN116432 | Substation-Adjacent | VA | Fluvanna County | 230 kV | 300 MW | 3.8 yrs | 60.7 |
| OZ Charlottesville | Greenfield | VA | Charlottesville | — | — | 3.1 yrs | 60.0 |
| EC Near Bremo Bluff | Greenfield | VA | Fluvanna | — | — | 3.1 yrs | 59.3 |
| UNKNOWN121546 | Substation-Adjacent | VA | Charlottesville city | 230 kV | 300 MW | 3.8 yrs | 59.1 |
| EC Near Bremo Bluff | Greenfield | VA | Fluvanna | — | — | 3.1 yrs | 58.9 |
| EC Near Bremo Bluff | Greenfield | VA | Fluvanna | — | — | 3.1 yrs | 58.9 |
See all datacenter sites in Virginia →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.