Security
BrownfieldCleveland, Montgomery, Texas · TX LFG Energy, LP
Security is a natural gas plant in Cleveland, Montgomery, Texas, retired 2019-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Montgomery County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Security — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| T H Wharton | natural gas plant | 248 | 30.6 mi | — |
| Atascocita | natural gas plant | 9 | 25.6 mi | — |
| Conroe | natural gas plant | 3 | 8.6 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Security
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Security, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EC Near T H Wharton | Greenfield | TX | Harris | — | — | 3.4 yrs | 67.9 |
| NORTH BELT | Substation-Adjacent | TX | Harris County | 345 kV | 600 MW | 1.7 yrs | 67.7 |
| OAK RIDGE | Substation-Adjacent | TX | Montgomery County | 345 kV | 600 MW | 1.7 yrs | 67.5 |
| ROTHWOOD | Substation-Adjacent | TX | Montgomery County | 345 kV | 600 MW | 1.7 yrs | 67.5 |
| UNKNOWN304285 | Substation-Adjacent | TX | Harris County | 345 kV | 600 MW | 1.7 yrs | 67.0 |
| OZ Harris | Greenfield | TX | Harris | — | — | 3.4 yrs | 66.9 |
| KUYKENDAHL | Substation-Adjacent | TX | Montgomery County | 345 kV | 600 MW | 1.7 yrs | 66.6 |
| TOMBALL | Substation-Adjacent | TX | Montgomery County | 345 kV | 600 MW | 1.7 yrs | 66.2 |
Nearby internet exchanges
- Databank Houston West (HOU1) (HOU2)Houston, TX · 33 networks
- Netrality Houston - 1301 FanninHouston, TX · 29 networks
- TRG Datacenters Houston (HOU1) (HOU2)Spring, TX · 17 networks
- Digital Realty HOU (12001 North Freeway)Houston, TX · 14 networks
See all datacenter sites in Texas →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Security, Cleveland, Montgomery, Texas. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.