Skip to content
Gridcensus

Conroe

Brownfield

Conroe, Montgomery, Texas · TX LFG Energy, LP

Legacy capacity
3
MW

Conroe is a natural gas plant in Conroe, Montgomery, Texas, retired 2012-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity3 MW
Retirement date2012-04-01
EIA plant ID#55555

Grid hookup & remediation

Nearest substation1.8 mi
Operator address2525 North Loop 336 East, Conroe, TX, 77301
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Montgomery County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)190,143
IT / tech employment350
Construction employment15,129
Land value$13,070/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate12.01¢/kWh
Industrial power rate7.45¢/kWh
Load growth (FERC-714)2.5%

Water & cooling

Water stressMedium-High
Public water supply57.3 MGD
Industrial water use1.1 MGD
Cooling degree days2,600
Mean annual temp65°F

Hazard, flood & connectivity

FEMA risk index55.0 · Very High
Fiber providers18 · 94% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Conroe — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
T H Whartonnatural gas plant24828.3 mi—
Atascocitanatural gas plant928.5 mi—
Securitynatural gas plant38.6 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Conroe

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Conroe, ranked by DC Readiness.

Candidate sites near Conroe
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near T H WhartonGreenfieldTXHarris——3.4 yrs67.9
NORTH BELTSubstation-AdjacentTXHarris County345 kV600 MW1.7 yrs67.7
ROTHWOODSubstation-AdjacentTXMontgomery County345 kV600 MW1.7 yrs67.5
OAK RIDGESubstation-AdjacentTXMontgomery County345 kV600 MW1.7 yrs67.5
UNKNOWN304285Substation-AdjacentTXHarris County345 kV600 MW1.7 yrs67.0
KUYKENDAHLSubstation-AdjacentTXMontgomery County345 kV600 MW1.7 yrs66.6
TOMBALLSubstation-AdjacentTXMontgomery County345 kV600 MW1.7 yrs66.2
EC Near AtascocitaGreenfieldTXHarris——3.4 yrs65.9

Nearby internet exchanges

See all datacenter sites in Texas →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen