Hardeeville

Brownfield

Hardeeville, Jasper, South Carolina · Dominion Energy South Carolina, Inc

Legacy capacity
16
MW

Hardeeville is a oil plant in Hardeeville, Jasper, South Carolina, retired 2022-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 16 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity16 MW
Retirement date2022-03-01
EIA plant ID#3286

Grid hookup & remediation

Nearest substation2.1 mi
OperatorDominion Energy South Carolina, Inc
Operator addressHardeeville Industrial Park, Hardeeville, SC, 29927
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Hardeeville, ranked by DC Readiness.

Candidate sites near Hardeeville
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCINTOSH COMBINED CYCLE FACILITYSubstation-AdjacentGAEffingham County230 kV300 MW3.7 yrs75.1
EFFINGHAM COUNTY POWER PROJECTSubstation-AdjacentGAEffingham County230 kV300 MW3.7 yrs74.6
BLANDFORDSubstation-AdjacentGAEffingham County500 kV1,000 MW3.7 yrs74.3
UNKNOWN112088Substation-AdjacentGAEffingham County230 kV300 MW3.7 yrs73.1
BURTONSubstation-AdjacentSCBeaufort County230 kV300 MW3.7 yrs72.7
WEST MCINTOSHSubstation-AdjacentGAEffingham County500 kV1,000 MW3.7 yrs72.2
DORCHESTERSubstation-AdjacentGAChatham County230 kV300 MW5.8 yrs71.5
Greenfield (WEST MCINTOSH - UNKNOWN155812)GreenfieldGAEffingham County500 kV1,000 MW3.7 yrs71.5

See all datacenter sites in South Carolina

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Hardeeville, Hardeeville, Jasper, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.