Hardeeville
BrownfieldHardeeville, Jasper, South Carolina · Dominion Energy South Carolina, Inc
Hardeeville is a oil plant in Hardeeville, Jasper, South Carolina, retired 2022-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 16 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Jasper County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Hardeeville — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Kraft | coal plant | 352 | 11.2 mi | — |
| McIntosh | coal plant | 178 | 6.8 mi | — |
| Riverside (GA) | natural gas plant | 106 | 14.9 mi | — |
| International Paper Savanna Mill | coal plant | 53 | 14.0 mi | — |
| Boulevard | natural gas plant | 47 | 18.3 mi | — |
| Burton | natural gas plant | 35 | 22.7 mi | — |
| Deptford Landfill | former landfill site | 1 | 19.7 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Hardeeville
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Hardeeville, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WEST MCINTOSH | Substation-Adjacent | GA | Effingham County | 500 kV | 1,000 MW | 1.0 yrs | 69.1 |
| BLANDFORD | Substation-Adjacent | GA | Effingham County | 500 kV | 1,000 MW | 1.0 yrs | 69.1 |
| YEMASSEE | Substation-Adjacent | SC | Colleton County | 230 kV | 300 MW | 1.0 yrs | 66.8 |
| KRAFT | Substation-Adjacent | GA | Chatham County | 230 kV | 300 MW | 1.0 yrs | 65.9 |
| UNKNOWN167524 | Substation-Adjacent | SC | Jasper County | 230 kV | 300 MW | 1.0 yrs | 65.7 |
| TAP170160 | Substation-Adjacent | SC | Jasper County | 230 kV | 300 MW | 1.0 yrs | 65.6 |
| UNKNOWN121080 | Substation-Adjacent | SC | Jasper County | 230 kV | 300 MW | 1.0 yrs | 65.6 |
| McIntosh | Brownfield | GA | Jasper County | 230 kV | 178 MW | 1.0 yrs | 65.5 |
See all datacenter sites in South Carolina →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Hardeeville, Hardeeville, Jasper, South Carolina. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.