McIntosh

Brownfield

Rincon, Effingham, Georgia · Georgia Power Co

Legacy capacity
178
MW

McIntosh is a coal plant in Rincon, Effingham, Georgia, retired 2019-07-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 178 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity178 MW
Retirement date2019-07-01
EIA plant ID#6124

Grid hookup & remediation

Nearest substation0.6 mi
OperatorGeorgia Power Co
Operator address981 Old Augusta Road, Rincon, GA, 31326
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near McIntosh, ranked by DC Readiness.

Candidate sites near McIntosh
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCINTOSH COMBINED CYCLE FACILITYSubstation-AdjacentGAEffingham County230 kV300 MW3.7 yrs75.1
EFFINGHAM COUNTY POWER PROJECTSubstation-AdjacentGAEffingham County230 kV300 MW3.7 yrs74.6
BLANDFORDSubstation-AdjacentGAEffingham County500 kV1,000 MW3.7 yrs74.3
UNKNOWN112088Substation-AdjacentGAEffingham County230 kV300 MW3.7 yrs73.1
WEST MCINTOSHSubstation-AdjacentGAEffingham County500 kV1,000 MW3.7 yrs72.2
DORCHESTERSubstation-AdjacentGAChatham County230 kV300 MW5.8 yrs71.5
Greenfield (WEST MCINTOSH - UNKNOWN155812)GreenfieldGAEffingham County500 kV1,000 MW3.7 yrs71.5
SANTEE COOPERSubstation-AdjacentSCBeaufort County230 kV300 MW3.7 yrs71.4

See all datacenter sites in Georgia

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for McIntosh, Rincon, Effingham, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.