New Richmond, Clermont, Ohio · Duke Energy Ohio Inc

Legacy capacity
1,433
MW

Walter C Beckjord is a coal plant in New Richmond, Clermont, Ohio, retired 2014-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1,433 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity1,433 MW
Retirement date2014-12-01
EIA plant ID#2830

Grid hookup & remediation

Nearest substation0.1 mi
Operator address757 US Rt 52, New Richmond, OH, 45200
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Walter C Beckjord, ranked by DC Readiness.

Candidate sites near Walter C Beckjord
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN113763Substation-AdjacentOHHamilton County345 kV600 MW3.8 yrs70.3
PIERCESubstation-AdjacentOHCampbell County345 kV600 MW3.8 yrs70.2
UNKNOWN113618Substation-AdjacentOHHamilton County345 kV600 MW3.8 yrs69.3
UNKNOWN113672Substation-AdjacentOHHamilton County345 kV600 MW3.8 yrs69.1
PORT UNION SUBSTATIONSubstation-AdjacentOHButler County345 kV600 MW3.8 yrs68.8
FOSTERSubstation-AdjacentOHWarren County345 kV600 MW3.8 yrs68.7
UNKNOWN113020Substation-AdjacentOHWarren County345 kV600 MW3.8 yrs68.7
UNKNOWN130105Substation-AdjacentKYKenton County345 kV600 MW3.8 yrs68.6

Nearby internet exchanges

See all datacenter sites in Ohio

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Walter C Beckjord, New Richmond, Clermont, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.