Shelby Municipal Light Plant

Brownfield

Shelby, Richland, Ohio · City of Shelby - (OH)

Legacy capacity
40
MW

Shelby Municipal Light Plant is a coal plant in Shelby, Richland, Ohio, retired 2019-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 40 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity40 MW
Retirement date2019-09-01
EIA plant ID#2943

Grid hookup & remediation

Nearest substation1.2 mi
OperatorCity of Shelby - (OH)
Operator address34 Mansfield Ave., Shelby, OH, 44875
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Shelby Municipal Light Plant, ranked by DC Readiness.

Candidate sites near Shelby Municipal Light Plant
SiteTypeStateCountyVoltageCapacityQueue waitScore
SOUTH BERWICKSubstation-AdjacentOHCrawford County345 kV600 MW3.2 yrs72.9
UNKNOWN114067Substation-AdjacentOHHuron County138 kV100 MW3.2 yrs68.9
TAP152402Substation-AdjacentOHMorrow County138 kV100 MW3.2 yrs68.5
UNKNOWN113310Substation-AdjacentOHRichland County138 kV100 MW3.2 yrs68.5
UNKNOWN152261Substation-AdjacentOHLorain County138 kV100 MW3.2 yrs67.7
TAP155873Substation-AdjacentOHHuron County138 kV100 MW3.2 yrs67.5
CITY OF SHELBY ELECTRIC DISTRIBUTIONSubstation-AdjacentOHRichland County138 kV100 MW3.2 yrs67.4
UNKNOWN154259Substation-AdjacentOHRichland County138 kV100 MW3.2 yrs67.3

See all datacenter sites in Ohio

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Shelby Municipal Light Plant, Shelby, Richland, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.