City of Shelby Electric Distribution

Brownfield

Shelby, Richland, Ohio · City of Shelby - (OH)

Legacy capacity
2
MW

City of Shelby Electric Distribution is a oil plant in Shelby, Richland, Ohio, retired 2019-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity2 MW
Retirement date2019-04-01
EIA plant ID#61076

Grid hookup & remediation

Nearest substation0.1 mi
Operator address73 West State St, Shelby, OH, 44875
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Richland County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)41,375
IT / tech employment7
Construction employment2,180
Land value$8,823/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate11.74¢/kWh
Industrial power rate8.51¢/kWh
Load growth (FERC-714)0.8%

Water & cooling

Water stressLow
Public water supply14.4 MGD
Industrial water use0.1 MGD
Cooling degree days900
Mean annual temp51°F

Hazard, flood & connectivity

FEMA risk index30.0 · Relatively Moderate
Fiber providers10 · 68% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near City of Shelby Electric Distribution — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Shelby Municipal Light Plantcoal plant401.2 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track City of Shelby Electric Distribution

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near City of Shelby Electric Distribution, ranked by DC Readiness.

Candidate sites near City of Shelby Electric Distribution
SiteTypeStateCountyVoltageCapacityQueue waitScore
GALIONSubstation-AdjacentOHMorrow County345 kV600 MW3.8 yrs61.0
OZ CrawfordGreenfieldOHCrawford——3.2 yrs59.5
OZ RichlandGreenfieldOHRichland——3.2 yrs58.6
EC Near Shelby Municipal Light PlantGreenfieldOHRichland——3.2 yrs58.6
EC Near Shelby Municipal Light PlantGreenfieldOHRichland——3.2 yrs58.1
Shelby Municipal Light PlantBrownfieldOHRichland County—40 MW3.2 yrs58.1
EC Near Oberlin (OH)GreenfieldOHLorain——3.2 yrs57.7
EC Coal Richland CountyGreenfieldOHRichland County——3.2 yrs57.5

See all datacenter sites in Ohio →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.