Carbon Limestone
BrownfieldLowellville, Mahoning, Ohio · Energy Developments, Inc d/b/a EDL
Carbon Limestone is a natural gas plant in Lowellville, Mahoning, Ohio, retired 2022-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 26 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Mahoning County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Carbon Limestone — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Niles Power Plant | coal plant | 266 | 16.6 mi | — |
| New Castle Plant | coal plant | 70 | 8.9 mi | — |
| Montgomery L&D Hydroelectric Project | former hydro site | 10 | 24.8 mi | — |
| Clevelandcliffs Warren | natural gas plant | 8 | 21.4 mi | — |
| Niles | oil plant | 5 | 16.9 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Carbon Limestone
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Carbon Limestone, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| HIGHLAND | Substation-Adjacent | OH | Trumbull County | 345 kV | 600 MW | 3.8 yrs | 64.8 |
| UNKNOWN162533 | Substation-Adjacent | OH | Mahoning County | 345 kV | 600 MW | 3.8 yrs | 64.4 |
| OZ Trumbull | Greenfield | OH | Trumbull | — | — | 3.2 yrs | 63.2 |
| OZ Mahoning | Greenfield | OH | Mahoning | — | — | 3.2 yrs | 63.0 |
| EC Coal Beaver County | Greenfield | PA | Beaver County | — | — | 3.0 yrs | 62.9 |
| SHENANGO | Substation-Adjacent | PA | Lawrence County | 345 kV | 600 MW | 3.8 yrs | 62.9 |
| EC Near Niles Power Plant | Greenfield | OH | Trumbull | — | — | 3.2 yrs | 62.8 |
| OZ Mahoning | Greenfield | OH | Mahoning | — | — | 3.2 yrs | 62.6 |
Nearby internet exchanges
- DataBank Pittsburgh (PIT1)Pittsburgh, PA · 38 networks
- Crown Castle Pittsburgh (Allegheny Center Mall)Pittsburgh, PA · 7 networks
- DQE Communications (Downtown Pittsburgh)Pittsburgh, PA · 6 networks
- EdgeConneX Pittsburgh (EDCPIT01)Pittsburgh, PA · 5 networks
See all datacenter sites in Ohio →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Carbon Limestone, Lowellville, Mahoning, Ohio. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.