Montgomery L&D Hydroelectric Project

Brownfield

Monaca, Beaver, Pennsylvania · Rye Development

Legacy capacity
10
MW

Montgomery L&D Hydroelectric Project is a former hydro site in Monaca, Beaver, Pennsylvania. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 10 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity10 MW
EIA plant ID#62400

Grid hookup & remediation

Nearest substation1.7 mi
OperatorRye Development
Operator addressTBD, Monaca, PA, 15052
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Montgomery L&D Hydroelectric Project, ranked by DC Readiness.

Candidate sites near Montgomery L&D Hydroelectric Project
SiteTypeStateCountyVoltageCapacityQueue waitScore
COLLIERSubstation-AdjacentPAAllegheny County345 kV600 MW3.2 yrs78.6
COLLIERSubstation-AdjacentPAAllegheny County345 kV600 MW3.0 yrs78.2
TAP151899Substation-AdjacentPAAllegheny County345 kV600 MW3.0 yrs77.7
BRUNOT ISLANDSubstation-AdjacentPAAllegheny County345 kV600 MW3.0 yrs77.1
CRANBERRYSubstation-AdjacentPAButler County500 kV1,000 MW3.0 yrs75.7
CLINTONSubstation-AdjacentPABeaver County345 kV600 MW3.0 yrs74.8
CRANBERRYSubstation-AdjacentWVHancock County500 kV1,000 MW3.2 yrs74.7
HOYTDALESubstation-AdjacentPABeaver County345 kV600 MW3.0 yrs74.6

Nearby internet exchanges

See all datacenter sites in Pennsylvania

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen