Roxboro
BrownfieldSemora, Person, North Carolina · Duke Energy Progress - (NC)
Roxboro is a oil plant in Semora, Person, North Carolina, retired 2007-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 16 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Person County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Roxboro — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Danville New Design Plant | oil plant | 2 | 20.7 mi | — |
| Danville Westover Plant | oil plant | 2 | 23.4 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Roxboro
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Roxboro, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CLOVER | Substation-Adjacent | VA | Charlotte County | 500 kV | 1,000 MW | 3.8 yrs | 65.5 |
| MAYO | Substation-Adjacent | NC | Person County | 500 kV | 1,000 MW | 3.8 yrs | 62.7 |
| EC Near Mas Durham Power, LLC | Greenfield | NC | Durham | — | — | 4.3 yrs | 62.5 |
| PERSON | Substation-Adjacent | NC | Person County | 500 kV | 1,000 MW | 3.8 yrs | 61.9 |
| UNKNOWN115130 | Substation-Adjacent | NC | Durham County | 230 kV | 300 MW | 3.8 yrs | 61.8 |
| HALIFAX | Substation-Adjacent | VA | Halifax County | 230 kV | 300 MW | 3.8 yrs | 60.1 |
| EAST DANVILLE | Substation-Adjacent | VA | Danville city | 230 kV | 300 MW | 3.8 yrs | 59.2 |
| TAP146707 | Substation-Adjacent | NC | Caswell County | 230 kV | 300 MW | 3.8 yrs | 58.5 |
Nearby internet exchanges
- CyrusOne NC-1Durham, NC · 6 networks
- TierPoint Raleigh – RTPDurham, NC · 4 networks
- vXchnge Raleigh-Durham (NC01)Durham, NC · 3 networks
- AceHost DurhamDurham · 1 networks
See all datacenter sites in North Carolina →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.