Caswell County, North Carolina · PJM

DC Readiness
59.3
Good / 100

TAP146707 is a substation-adjacent datacenter candidate site in Caswell County, North Carolina, interconnecting through PJM. It screens at 59.3/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP146707
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityDUKE ENERGY CAROLINAS, LLCinvestor ownedmoderate to large load · terms ≥ 100 MWLarge Load Customer terms (≥100 MW): minimum bills, contract demand · 10 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth177
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCyrusOne NC-1
IXP distance43.7 mi
Fiber providers5
Fiber coverage69.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterBrandaleone Lab for Data and Visualization
DC distance38.2 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.84¢/kWh
Industrial electricity8.31¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$4,006

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 3 nearby

Get alerts

Track TAP146707

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
36
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
84
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Caswell County, ranked by DC Readiness.

Sites near TAP146707
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN113945Substation-Adjacent230 kV300 MW3.8 yrs58.7
OZ CaswellGreenfield——4.3 yrs55.7
UNKNOWN113949Substation-Adjacent100 kV50 MW3.8 yrs53.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for TAP146707, Caswell County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.