Skip to content
Gridcensus

Dan River

Brownfield

Eden, Rockingham, North Carolina · Duke Energy Carolinas, LLC

Legacy capacity
388
MW

Dan River is a coal plant in Eden, Rockingham, North Carolina, retired 2012-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 388 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity388 MW
Retirement date2012-10-01
EIA plant ID#2723

Grid hookup & remediation

Nearest substation0.1 mi
Operator address900 S Edgewood Rd, Eden, NC, 27288
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Rockingham County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)21,047
Construction employment1,543
Land value$5,089/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate10.18¢/kWh
Industrial power rate7.16¢/kWh
Load growth (FERC-714)1.5%

Water & cooling

Water stressLow
Public water supply11.4 MGD
Industrial water use0.0 MGD
Cooling degree days1,600
Mean annual temp59°F

Hazard, flood & connectivity

FEMA risk index42.0 · Relatively High
Fiber providers5 · 41% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Dan River — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Maple Street Substationformer brownfield site915.7 micleanup_complete
White Street Landfillformer landfill site527.7 micleanup_complete
Danville New Design Plantoil plant220.6 mi—
Danville Westover Plantoil plant216.7 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Dan River

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Dan River, ranked by DC Readiness.

Candidate sites near Dan River
SiteTypeStateCountyVoltageCapacityQueue waitScore
AXTONSubstation-AdjacentVAMartinsville city765 kV1,000 MW3.8 yrs66.2
Maple Street SubstationBrownfieldVAMartinsville—9 MW3.8 yrs62.7
OZ MartinsvilleGreenfieldVAMartinsville——3.1 yrs60.7
EC FFE Martinsville cityGreenfieldVAMartinsville city——3.1 yrs60.7
EAST DANVILLESubstation-AdjacentVADanville city230 kV300 MW3.8 yrs60.5
OZ HenryGreenfieldVAHenry——3.1 yrs59.8
UNKNOWN115021Substation-AdjacentNCGuilford County230 kV300 MW3.8 yrs59.6
EC Coal Henry CountyGreenfieldVAHenry County——3.1 yrs59.5

See all datacenter sites in North Carolina →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Dan River, Eden, Rockingham, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.