Asheville

Brownfield

Arden, Buncombe, North Carolina · Duke Energy Progress - (NC)

Legacy capacity
414
MW

Asheville is a coal plant in Arden, Buncombe, North Carolina, retired 2020-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 414 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity414 MW
Retirement date2020-01-01
EIA plant ID#2706

Grid hookup & remediation

Nearest substation0.7 mi
OperatorDuke Energy Progress - (NC)
Operator address200 CP&L Drive, Arden, NC, 28704
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Asheville, ranked by DC Readiness.

Candidate sites near Asheville
SiteTypeStateCountyVoltageCapacityQueue waitScore
CRAGGYSubstation-AdjacentNCBuncombe County230 kV300 MW3.7 yrs72.4
WEST ASHEVILLESubstation-AdjacentNCBuncombe County115 kV100 MW3.7 yrs72.3
UNKNOWN109907Substation-AdjacentNCHenderson County230 kV300 MW3.7 yrs72.2
UNKNOWN110545Substation-AdjacentNCHenderson County115 kV100 MW3.7 yrs72.1
UNKNOWN109942Substation-AdjacentNCBuncombe County115 kV100 MW3.7 yrs71.7
ASHEVILLESubstation-AdjacentNCBuncombe County115 kV100 MW3.7 yrs71.5
UNKNOWN110128Substation-AdjacentNCMadison County115 kV100 MW3.7 yrs71.2
MARSHALL DAMSubstation-AdjacentNCMadison County115 kV100 MW3.7 yrs71.1

Nearby internet exchanges

See all datacenter sites in North Carolina

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen