Skip to content
Gridcensus

Reid Gardner

Brownfield

Moapa, Clark, Nevada · Nevada Power Co

Legacy capacity
637
MW

Reid Gardner is a coal plant in Moapa, Clark, Nevada, retired 2017-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 637 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity637 MW
Retirement date2017-03-01
EIA plant ID#2324

Grid hookup & remediation

Nearest substation0.1 mi
Operator addressI-15, Exit 88 Hidden Valley Rd, Moapa, NV, 89025
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Reid Gardner, ranked by DC Readiness.

Candidate sites near Reid Gardner
SiteTypeStateCountyVoltageCapacityQueue waitScore
APEXSubstation-AdjacentNVClark County500 kV1,000 MW6.9 yrs62.0
LENZIESubstation-AdjacentNVClark County500 kV1,000 MW6.9 yrs61.7
UNKNOWN308478Substation-AdjacentNVClark County500 kV1,000 MW6.9 yrs61.6
BLM Solar DLA: Dry LakeGreenfieldNVClark County1,474 MW5.8 yrs61.1
HARRY ALLEN (500KV)Substation-AdjacentNVClark County500 kV1,000 MW6.9 yrs60.2
EC Coal Clark CountyGreenfieldNVClark County5.8 yrs60.0
CRYSTALSubstation-AdjacentNVClark County500 kV1,000 MW6.9 yrs59.0
Moapa Paiute Energy CenterBrownfieldNVClark County138 kV1,210 MW5.8 yrs58.3

Nearby internet exchanges

See all datacenter sites in Nevada

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Reid Gardner, Moapa, Clark, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.