Mohave
BrownfieldLaughlin, Clark, Nevada · Southern California Edison Co
Mohave is a coal plant in Laughlin, Clark, Nevada, retired 2012-07-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1,636 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Mohave, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MOHAVE | Substation-Adjacent | AZ | Mohave County | 500 kV | 1,000 MW | 5.7 yrs | 74.8 |
| Mohave | Brownfield | NV | Clark | — | 1,636 MW | — | 69.3 |
| TAP318039 | Substation-Adjacent | AZ | Mohave County | 230 kV | 300 MW | 5.7 yrs | 64.1 |
| SOUTH POINT ENERGY CENTER | Substation-Adjacent | AZ | Mohave County | 230 kV | 300 MW | 5.7 yrs | 63.8 |
| Greenfield (ELDORADO - None) | Greenfield | AZ | Mohave County | 500 kV | 1,000 MW | 5.7 yrs | 62.5 |
| TAP318000 | Substation-Adjacent | AZ | Mohave County | 230 kV | 300 MW | 5.7 yrs | 62.4 |
| Greenfield (ELDORADO - None) | Greenfield | AZ | Mohave County | 500 kV | 1,000 MW | 5.7 yrs | 61.8 |
| Greenfield (ELDORADO - None) | Greenfield | NV | Clark County | 500 kV | 1,000 MW | 5.7 yrs | 61.6 |
See all datacenter sites in Nevada →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Mohave, Laughlin, Clark, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.