MU Combined Heat and Power Plant
BrownfieldColumbia, Boone, Missouri · Curators of the University of Missouri
MU Combined Heat and Power Plant is a natural gas plant in Columbia, Boone, Missouri, retired 2023-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 6 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Boone County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near MU Combined Heat and Power Plant — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Columbia (MO) | coal plant | 39 | 1.5 mi | — |
| Fulton (MO) | oil plant | 5 | 21.4 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track MU Combined Heat and Power Plant
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near MU Combined Heat and Power Plant, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| OVERTON (345KV) | Substation-Adjacent | MO | Cooper County | 345 kV | 600 MW | 2.8 yrs | 62.9 |
| UNKNOWN117810 | Substation-Adjacent | MO | Callaway County | 345 kV | 600 MW | 2.8 yrs | 62.2 |
| UNKNOWN117844 | Substation-Adjacent | MO | Callaway County | 345 kV | 600 MW | 2.8 yrs | 62.0 |
| EC Near Columbia (MO) | Greenfield | MO | Boone | — | — | 1.4 yrs | 60.9 |
| EC Near Columbia (MO) | Greenfield | MO | Boone | — | — | 1.4 yrs | 60.8 |
| EC Near Columbia (MO) | Greenfield | MO | Boone | — | — | 1.4 yrs | 60.7 |
| EC Coal Boone County | Greenfield | MO | Boone County | — | — | 1.4 yrs | 60.4 |
| OZ Cole | Greenfield | MO | Cole | — | — | 1.4 yrs | 60.1 |
See all datacenter sites in Missouri →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
Every site and score for MU Combined Heat and Power Plant, Columbia, Boone, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.