Skip to content
Gridcensus

Industri-Plex

Brownfield

Woburn, Massachusetts

Legacy capacity
4
MW

Industri-Plex is a former superfund site in Woburn, Massachusetts. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 4 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer superfund site
Site typeepa_brownfield
Existing capacity4 MW
Acreage481 ac

Grid hookup & remediation

Nearest substation1.7 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former superfund site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Industri-Plex — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Mystic Generating Stationnatural gas plant2,8448.0 mi—
Salem Harboroil plant80514.4 mi—
New Boston Generating Stationnatural gas plant71811.9 mi—
Tanner Street Generationnatural gas plant15112.9 mi—
Potter Station 2natural gas plant10619.9 mi—
Kendall Square Stationnatural gas plant609.4 mi—
General Electric Aircraft Enginesnatural gas plant549.5 mi—
Exelon Edgar LLCoil plant2819.5 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Industri-Plex

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Industri-Plex, ranked by DC Readiness.

Candidate sites near Industri-Plex
SiteTypeStateCountyVoltageCapacityQueue waitScore
MYSTICSubstation-AdjacentMASuffolk County345 kV600 MW3.9 yrs70.6
K STREETSubstation-AdjacentMASuffolk County345 kV600 MW3.9 yrs70.6
EAGLESubstation-AdjacentNHHillsborough County345 kV600 MW3.9 yrs69.4
UNKNOWN132744Substation-AdjacentNHHillsborough County345 kV600 MW3.9 yrs68.7
TAP137062Substation-AdjacentNHHillsborough County230 kV300 MW3.9 yrs67.7
MAMMOTH ROADSubstation-AdjacentNHRockingham County230 kV300 MW3.9 yrs67.0
UNKNOWN133682Substation-AdjacentMAMiddlesex County450 kV600 MW3.9 yrs66.3
KINGSTON STREETSubstation-AdjacentMASuffolk County345 kV600 MW3.9 yrs66.2

Nearby internet exchanges

See all datacenter sites in Massachusetts →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Industri-Plex, Woburn, Massachusetts is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.