Potter Station 2

Brownfield

Braintree, Norfolk, Massachusetts · Town of Braintree - (MA)

Legacy capacity
106
MW

Potter Station 2 is a natural gas plant in Braintree, Norfolk, Massachusetts, retired 2024-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 106 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity106 MW
Retirement date2024-01-01
EIA plant ID#1660

Grid hookup & remediation

Nearest substation0.1 mi
OperatorTown of Braintree - (MA)
Operator address150 Potter Road, Braintree, MA, 2184
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Potter Station 2, ranked by DC Readiness.

Candidate sites near Potter Station 2
SiteTypeStateCountyVoltageCapacityQueue waitScore
ANP BELLINGHAM ENERGY PROJECTSubstation-AdjacentMANorfolk County345 kV600 MW3.5 yrs72.9
KINGSTON STREETSubstation-AdjacentMASuffolk County345 kV600 MW3.5 yrs72.2
K STREETSubstation-AdjacentMASuffolk County345 kV600 MW3.5 yrs71.1
WALTHAMSubstation-AdjacentMAMiddlesex County230 kV300 MW3.5 yrs70.9
NORTH CAMBRIDGESubstation-AdjacentMASuffolk County345 kV600 MW3.5 yrs70.6
GOLDEN HILLSSubstation-AdjacentMASuffolk County345 kV600 MW3.5 yrs70.4
MYSTICSubstation-AdjacentMASuffolk County345 kV600 MW3.5 yrs70.1
WAKEFIELD JUNCTIONSubstation-AdjacentMASuffolk County345 kV600 MW3.5 yrs69.5

Nearby internet exchanges

See all datacenter sites in Massachusetts

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.