Greenfield Solar Farm

Brownfield

Greenfield, Massachusetts

Legacy capacity
2
MW

Greenfield Solar Farm is a former landfill site in Greenfield, Massachusetts. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer landfill site
Site typeepa_brownfield
Existing capacity2 MW
Acreage23 ac

Grid hookup & remediation

Nearest substation2.8 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former landfill site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Greenfield Solar Farm, ranked by DC Readiness.

Candidate sites near Greenfield Solar Farm
SiteTypeStateCountyVoltageCapacityQueue waitScore
AMHERSTSubstation-AdjacentMAFranklin County345 kV600 MW3.5 yrs64.8
MOUNT TOMSubstation-AdjacentMAHampshire County115 kV100 MW3.5 yrs63.4
VERMONT YANKEESubstation-AdjacentMAFranklin County345 kV600 MW3.5 yrs62.9
UNKNOWN133478Substation-AdjacentMAHampshire County115 kV100 MW3.5 yrs62.7
NORTHFIELDSubstation-AdjacentMAFranklin County345 kV600 MW3.5 yrs62.6
UNKNOWN140782Substation-AdjacentMAHampshire County115 kV100 MW3.5 yrs62.2
Northampton Landfill SolarBrownfieldMAHampshire3 MW61.9
TAP140792Substation-AdjacentMAHampden County115 kV100 MW3.5 yrs61.9

Nearby internet exchanges

See all datacenter sites in Massachusetts

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield Solar Farm, Greenfield, Massachusetts. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.