East Bridgewater

Brownfield

East Bridgewater, Plymouth, Massachusetts · Gas Recovery Systems Inc

Legacy capacity
6
MW

East Bridgewater is a natural gas plant in East Bridgewater, Plymouth, Massachusetts, retired 2010-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 6 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity6 MW
Retirement date2010-12-01
EIA plant ID#55584

Grid hookup & remediation

Nearest substation2.1 mi
OperatorGas Recovery Systems Inc
Operator address234 Thatcher Street, East Bridgewater, MA, 2333
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near East Bridgewater, ranked by DC Readiness.

Candidate sites near East Bridgewater
SiteTypeStateCountyVoltageCapacityQueue waitScore
ANP BELLINGHAM ENERGY PROJECTSubstation-AdjacentMANorfolk County345 kV600 MW3.5 yrs72.9
KINGSTON STREETSubstation-AdjacentMASuffolk County345 kV600 MW3.5 yrs72.2
K STREETSubstation-AdjacentMASuffolk County345 kV600 MW3.5 yrs71.1
WALTHAMSubstation-AdjacentMAMiddlesex County230 kV300 MW3.5 yrs70.9
NORTH CAMBRIDGESubstation-AdjacentMASuffolk County345 kV600 MW3.5 yrs70.6
MYSTICSubstation-AdjacentMASuffolk County345 kV600 MW3.5 yrs70.1
BERRY STREETSubstation-AdjacentRIProvidence County345 kV600 MW3.5 yrs69.1
LEXINGTONSubstation-AdjacentMAMiddlesex County345 kV600 MW3.5 yrs68.9

Nearby internet exchanges

See all datacenter sites in Massachusetts

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for East Bridgewater, East Bridgewater, Plymouth, Massachusetts. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.