Deer Island Treatment Plant

Brownfield

Winthrop, Suffolk, Massachusetts · Massachusetts Wtr Rauth-Deer I

Legacy capacity
12
MW

Deer Island Treatment Plant is a former biomass site in Winthrop, Suffolk, Massachusetts, retired 2004-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 12 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer biomass site
Site typeretired_plant
Existing capacity12 MW
Retirement date2004-03-01
EIA plant ID#10823

Grid hookup & remediation

Nearest substation4.0 mi
Operator address190 Tafts Avenue, Winthrop, MA, 2152
Why this site is datacenter-attractive: a former biomass site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Suffolk County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)633,927
IT / tech employment3,693
Construction employment15,587
Land value$52,340/acre

Power economics & interconnection

Commercial power rate17.62¢/kWh
Industrial power rate16.73¢/kWh
Load growth (FERC-714)0.4%

Water & cooling

Water stressLow
Public water supply0.0 MGD
Industrial water use0.6 MGD
Cooling degree days600
Mean annual temp49°F

Hazard, flood & connectivity

FEMA risk index22.0 · Relatively Low
Fiber providers11 · 86% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Deer Island Treatment Plant — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Mystic Generating Stationnatural gas plant2,8445.9 mi—
Salem Harboroil plant80512.7 mi—
New Boston Generating Stationnatural gas plant7183.8 mi—
Tanner Street Generationnatural gas plant15126.3 mi—
Potter Station 2natural gas plant1068.2 mi—
Kendall Square Stationnatural gas plant606.0 mi—
General Electric Aircraft Enginesnatural gas plant546.7 mi—
Exelon Edgar LLCoil plant287.7 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Deer Island Treatment Plant

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Deer Island Treatment Plant, ranked by DC Readiness.

Candidate sites near Deer Island Treatment Plant
SiteTypeStateCountyVoltageCapacityQueue waitScore
MYSTICSubstation-AdjacentMASuffolk County345 kV600 MW3.9 yrs71.3
K STREETSubstation-AdjacentMASuffolk County345 kV600 MW3.9 yrs71.2
KINGSTON STREETSubstation-AdjacentMASuffolk County345 kV600 MW3.9 yrs66.3
NORTH CAMBRIDGESubstation-AdjacentMASuffolk County345 kV600 MW3.9 yrs66.1
WAKEFIELD JUNCTIONSubstation-AdjacentMASuffolk County345 kV600 MW3.9 yrs66.0
TEWKSBURY NO. 22ASubstation-AdjacentMAMiddlesex County345 kV600 MW3.9 yrs65.2
LEXINGTONSubstation-AdjacentMAMiddlesex County345 kV600 MW3.9 yrs65.1
GOLDEN HILLSSubstation-AdjacentMASuffolk County345 kV600 MW3.9 yrs65.0

Nearby internet exchanges

See all datacenter sites in Massachusetts →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.