Red Cedar

Brownfield

Cedar Rapids, Linn, Iowa · Interstate Power and Light Co

Legacy capacity
23
MW

Red Cedar is a natural gas plant in Cedar Rapids, Linn, Iowa, retired 2018-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 23 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity23 MW
Retirement date2018-06-01
EIA plant ID#7595

Grid hookup & remediation

Nearest substation0.7 mi
OperatorInterstate Power and Light Co
Operator address828 First St S.W., Cedar Rapids, IA, 52404
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Red Cedar, ranked by DC Readiness.

Candidate sites near Red Cedar
SiteTypeStateCountyVoltageCapacityQueue waitScore
TIFFINSubstation-AdjacentIAJohnson County345 kV600 MW1.4 yrs78.6
HILLSSubstation-AdjacentIAJohnson County345 kV600 MW1.4 yrs75.6
ARNOLDSubstation-AdjacentIALinn County345 kV600 MW1.4 yrs74.8
UNKNOWN159106Substation-AdjacentIAJohnson County161 kV100 MW1.4 yrs74.4
UNKNOWN132168Substation-AdjacentIAJohnson County161 kV100 MW1.4 yrs72.8
UNKNOWN137713Substation-AdjacentIAJohnson County161 kV100 MW1.4 yrs71.8
RISER137656Substation-AdjacentIAJohnson County161 kV100 MW1.4 yrs71.6
UNKNOWN137652Substation-AdjacentIAJohnson County161 kV100 MW1.4 yrs71.6

Nearby internet exchanges

See all datacenter sites in Iowa

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Red Cedar, Cedar Rapids, Linn, Iowa. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.