Alliant SBD 9302 Aegon NP

Brownfield

Linn County, Iowa · MISO

DC Readiness
68.4
Good / 100

Alliant SBD 9302 Aegon NP is a brownfield datacenter candidate site in Linn County, Iowa, interconnecting through MISO. It screens at 68.4/100 DC Readiness with a catalogued 1 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN132052
Substation distance1.1 mi
Available capacity1 MW
LMP zoneMISO_MISO_CENTRAL
Wholesale LMP$27.30/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth23
Avg queue wait2.8 yrs

Connectivity

Nearest IXPEnseva Cedar Rapids
IXP distance2.4 mi
Fiber providers22
Fiber coverage52.5%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance103.5 mi

Site characteristics

Site typeBrownfield
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity
Former useoil
Existing capacity1 MW
Retirement date2021-11-01

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteAEGON USA
Hazard sub-score60/100
Construction cost index94.7 (avg 100)

Location context

Nearest datacenterEnseva Cedar Rapids
DC distance2.4 mi
Nearest rail1.0 mi
Nearest gas pipeline15.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.22¢/kWh
Industrial electricity8.66¢/kWh
Cooling degree days900
Heating degree days6,500
Land price / acre$10,758

Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
43
Speed to power15%
45
Fiber connectivity12%
87
Energy cost10%
94
Water risk8%
91
Natural hazard8%
60
Buildability7%
95
Labor market4%
50
DC cluster4%
100
Land / acreage3%
56
Construction cost3%
71
Gas pipeline2%
51
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Linn County, ranked by DC Readiness.

Sites near Alliant SBD 9302 Aegon NP
SiteTypeVoltageCapacityQueue waitScore
ARNOLDSubstation-Adjacent345 kV600 MW2.8 yrs66.8
EC Near Red CedarGreenfield1.4 yrs65.8
EC Coal Linn CountyGreenfield1.4 yrs65.7
EC Coal Linn CountyGreenfield1.4 yrs64.7
EC Near Red CedarGreenfield1.4 yrs64.7
EC Near Sixth StreetGreenfield1.4 yrs64.3
EC Coal Linn CountyGreenfield1.4 yrs64.3
EC Near Alliant SBD 9801 Aegon Martha's WayGreenfield1.4 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Alliant SBD 9302 Aegon NP, Linn County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.