Scherer

Brownfield

Juliette, Monroe, Georgia · Georgia Power Co

Legacy capacity
891
MW

Scherer is a coal plant in Juliette, Monroe, Georgia, retired 2022-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 891 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity891 MW
Retirement date2022-01-01
EIA plant ID#6257

Grid hookup & remediation

Nearest substation0.3 mi
Operator address10986 Highway 87, Juliette, GA, 31046
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Scherer, ranked by DC Readiness.

Candidate sites near Scherer
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN115783Substation-AdjacentGAMonroe County500 kV1,000 MW1.0 yrs67.6
EC Near Rumble Road Energy CenterGreenfieldGAMonroe5.8 yrs63.4
EC Coal Jasper CountyGreenfieldGAJasper County5.8 yrs63.2
EC Coal Butts CountyGreenfieldGAButts County5.8 yrs63.0
EC Coal Jones CountyGreenfieldGAJones County5.8 yrs62.5
UNKNOWN158160Substation-AdjacentGAPutnam County230 kV300 MW1.0 yrs62.3
EC Coal Monroe CountyGreenfieldGAMonroe County5.8 yrs62.1
UNKNOWN112365Substation-AdjacentGAJasper County230 kV300 MW1.0 yrs62.0

See all datacenter sites in Georgia

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Scherer, Juliette, Monroe, Georgia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.