Rumble Road Energy Center

Brownfield

Smarr, Monroe, Georgia · Oglethorpe Power Corporation

Legacy capacity
660
MW

Rumble Road Energy Center is a natural gas plant in Smarr, Monroe, Georgia. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 660 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity660 MW
EIA plant ID#57209

Grid hookup & remediation

Nearest substation0.6 mi
Operator address1107 Rumble Road, Smarr, GA, 31086
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Monroe County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)5,043
Construction employment617
Land value$4,275/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate12.53¢/kWh
Industrial power rate8.12¢/kWh
Load growth (FERC-714)1.8%

Water & cooling

Water stressLow-Medium
Public water supply1.6 MGD
Industrial water use0.0 MGD
Cooling degree days2,200
Mean annual temp64°F

Hazard, flood & connectivity

FEMA risk index40.0 · Relatively High
Fiber providers8 · 91% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Rumble Road Energy Center — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Scherercoal plant8916.3 mi—
Arkwrightnatural gas plant2149.1 mi—
YKK USA Chestneyoil plant521.0 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Rumble Road Energy Center

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Rumble Road Energy Center, ranked by DC Readiness.

Candidate sites near Rumble Road Energy Center
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN115783Substation-AdjacentGAMonroe County500 kV1,000 MW1.0 yrs72.0
UNKNOWN116001Substation-AdjacentGASpalding County230 kV300 MW1.0 yrs67.1
UNKNOWN112365Substation-AdjacentGAJasper County230 kV300 MW1.0 yrs65.9
UNKNOWN158160Substation-AdjacentGAPutnam County230 kV300 MW1.0 yrs65.7
UNKNOWN113560Substation-AdjacentGACrawford County230 kV300 MW1.0 yrs65.5
UNKNOWN113537Substation-AdjacentGATwiggs County230 kV300 MW1.0 yrs65.4
UNKNOWN115738Substation-AdjacentGALamar County230 kV300 MW1.0 yrs64.6
UNKNOWN114837Substation-AdjacentGABibb County230 kV300 MW1.0 yrs64.1

See all datacenter sites in Georgia →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.