Pacific Coast Pipeline
BrownfieldFillmore, California
Pacific Coast Pipeline is a former superfund site in Fillmore, California. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Pacific Coast Pipeline, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SANTA CLARA | Substation-Adjacent | CA | Ventura County | 230 kV | 300 MW | 5.7 yrs | 63.0 |
| STATION T | Substation-Adjacent | CA | Los Angeles County | 230 kV | 300 MW | 5.7 yrs | 62.7 |
| SAUGUS | Substation-Adjacent | CA | Los Angeles County | 230 kV | 300 MW | 5.7 yrs | 61.3 |
| TARZANA(STATION U) | Substation-Adjacent | CA | Los Angeles County | 230 kV | 300 MW | 5.7 yrs | 61.2 |
| MISSION | Substation-Adjacent | CA | Ventura County | 230 kV | 300 MW | 5.7 yrs | 60.7 |
| CASTAIC | Substation-Adjacent | CA | Ventura County | 230 kV | 300 MW | 5.7 yrs | 60.4 |
| Greenfield (VINCENT - MIDWAY) | Greenfield | CA | Ventura County | 500 kV | 1,000 MW | 5.8 yrs | 60.2 |
| Greenfield (VINCENT - MIDWAY) | Greenfield | CA | Ventura County | 500 kV | 1,000 MW | 5.8 yrs | 60.2 |
Nearby internet exchanges
- Equinix LA3/LA4 - Los Angeles, El SegundoEl Segundo, CA · 53 networks
- Digital Realty LAX (2260 E El Segundo)El Segundo, CA · 8 networks
- QuadraNet LAXLos Angeles, CA · 8 networks
- Evocative LAX14Los Angeles, CA · 8 networks
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Pacific Coast Pipeline, Fillmore, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.