Pacific Coast Pipeline

Brownfield

Fillmore, California

Legacy capacity
3
MW

Pacific Coast Pipeline is a former superfund site in Fillmore, California. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer superfund site
Site typeepa_brownfield
Existing capacity3 MW
Acreage55 ac

Grid hookup & remediation

Nearest substation8.2 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former superfund site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Pacific Coast Pipeline, ranked by DC Readiness.

Candidate sites near Pacific Coast Pipeline
SiteTypeStateCountyVoltageCapacityQueue waitScore
SANTA CLARASubstation-AdjacentCAVentura County230 kV300 MW5.7 yrs63.0
STATION TSubstation-AdjacentCALos Angeles County230 kV300 MW5.7 yrs62.7
SAUGUSSubstation-AdjacentCALos Angeles County230 kV300 MW5.7 yrs61.3
TARZANA(STATION U)Substation-AdjacentCALos Angeles County230 kV300 MW5.7 yrs61.2
MISSIONSubstation-AdjacentCAVentura County230 kV300 MW5.7 yrs60.7
CASTAICSubstation-AdjacentCAVentura County230 kV300 MW5.7 yrs60.4
Greenfield (VINCENT - MIDWAY)GreenfieldCAVentura County500 kV1,000 MW5.8 yrs60.2
Greenfield (VINCENT - MIDWAY)GreenfieldCAVentura County500 kV1,000 MW5.8 yrs60.2

Nearby internet exchanges

See all datacenter sites in California

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen