Greenleaf 1

Brownfield

Yuba City, Sutter, California · Calpine Greenleaf Holding, Inc.

Legacy capacity
66
MW

Greenleaf 1 is a natural gas plant in Yuba City, Sutter, California, retired 2019-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 66 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity66 MW
Retirement date2019-03-01
EIA plant ID#10350

Grid hookup & remediation

Nearest substation0.2 mi
OperatorCalpine Greenleaf Holding, Inc.
Operator address5087 South Townshio Road, Yuba City, CA, 95993
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Greenleaf 1, ranked by DC Readiness.

Candidate sites near Greenleaf 1
SiteTypeStateCountyVoltageCapacityQueue waitScore
FIDDYMENTSubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs63.2
FOOTHILLSubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs63.2
UNKNOWN302253Substation-AdjacentCASacramento County230 kV300 MW5.7 yrs63.1
WESTPLANSubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs62.8
RIO OSOSubstation-AdjacentCASutter County230 kV300 MW5.7 yrs61.4
ROSEVILLESubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs61.0
DALY-ROSEVILLESubstation-AdjacentCASacramento County230 kV300 MW5.7 yrs60.9
SUTTERSubstation-AdjacentCASutter County230 kV300 MW5.7 yrs59.7

Nearby internet exchanges

See all datacenter sites in California

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenleaf 1, Yuba City, Sutter, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.