Collins Pine Project
BrownfieldChester, Plumas, California · Collins Pine Co
Collins Pine Project is a former biomass site in Chester, Plumas, California, retired 2020-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 12 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Plumas County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Collins Pine Project — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Sierra Pacific Quincy Facility | former biomass site | 28 | 30.7 mi | — |
| Rock Creek Dam | former hydro site | 4 | 22.0 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Collins Pine Project
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Collins Pine Project, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BUCKS CREEK | Substation-Adjacent | CA | Plumas County | 230 kV | 300 MW | 8.2 yrs | 50.3 |
| BELDEN | Substation-Adjacent | CA | Plumas County | 230 kV | 300 MW | 8.2 yrs | 48.7 |
| TAP302668 | Substation-Adjacent | CA | Plumas County | 230 kV | 300 MW | 8.2 yrs | 48.6 |
| CARIBOU | Substation-Adjacent | CA | Plumas County | 230 kV | 300 MW | 8.2 yrs | 48.4 |
| ROCK CREEK | Substation-Adjacent | CA | Butte County | 230 kV | 300 MW | 8.2 yrs | 48.2 |
| GRIZZLY | Substation-Adjacent | CA | Butte County | 230 kV | 300 MW | 8.2 yrs | 48.2 |
| Collins Pine Project | Brownfield | CA | Plumas County | 35 kV | 12 MW | 5.7 yrs | 46.1 |
| EAST QUINCY | Substation-Adjacent | CA | Plumas County | 69 kV | 50 MW | 8.2 yrs | 44.0 |
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
Every site and score for Collins Pine Project, Chester, Plumas, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.