American Canyon Solar Farm
BrownfieldAmerican Canyon, California
American Canyon Solar Farm is a former landfill site in American Canyon, California. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near American Canyon Solar Farm, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ROSSMOOR | Substation-Adjacent | CA | Contra Costa County | 230 kV | 300 MW | 5.7 yrs | 62.7 |
| EMBARCADERO | Substation-Adjacent | CA | Contra Costa County | 230 kV | 300 MW | 5.7 yrs | 62.4 |
| San Francisco Electric Reliability Proj | Brownfield | CA | Contra Costa | — | 152 MW | — | 61.9 |
| LAKEVILLE | Substation-Adjacent | CA | Marin County | 230 kV | 300 MW | 5.7 yrs | 61.6 |
| TIDEWATER | Substation-Adjacent | CA | Contra Costa County | 230 kV | 300 MW | 5.7 yrs | 61.4 |
| VACA-DIXON | Substation-Adjacent | CA | Solano County | 500 kV | 1,000 MW | 5.7 yrs | 61.2 |
| BAHIA | Substation-Adjacent | CA | Contra Costa County | 230 kV | 300 MW | 5.7 yrs | 60.4 |
| SCHNITZER STEEL | Substation-Adjacent | CA | Contra Costa County | 115 kV | 100 MW | 5.7 yrs | 60.3 |
Nearby internet exchanges
- Digital Realty SFO (200 Paul)San Francisco, CA · 45 networks
- Digital Realty SFO (365 Main)San Francisco, CA · 36 networks
- Digital Realty OAK (720 2nd St)Oakland, CA · 6 networks
- Evocative Emeryville (EM1)Emeryville, CA · 3 networks
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for American Canyon Solar Farm, American Canyon, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.